A platform for research: civil engineering, architecture and urbanism
Infilled wall construction device and construction method based on BIM (Building Information Modeling)
The invention discloses a BIM-based infilled wall construction device and method.The infilled wall construction device comprises two supporting rods, a cross beam and a guide wheel, the cross beam is arranged between the tops of the two supporting rods, the guide wheel is arranged in the middle of the bottom of the cross beam, and a first supporting column is arranged on the lower middle portion of each supporting rod; a guide roller is arranged on the first supporting column, a motor is arranged on one side of the guide roller, and a traction rope is wound on the guide roller. According to the method, modeling of the components can be displayed more visually by utilizing BIM for model creation, construction can be better facilitated through model deepening, the collision problem of all the components, pipelines and the like can be solved in advance by coordinating function application, the construction difficulty is reduced, and the construction quality is guaranteed.
本发明公开了一种基于BIM的填充墙施工装置及施工方法,其中,该填充墙施工装置包括支杆、横梁和导线轮,支杆为两个,并在两个支杆的顶部之间设置有横梁,横梁底部的中间设置有导向轮,支杆的中下部设置有第一支柱,第一支柱上设置有导线辊,导向辊的一侧设置有电机,导向辊上缠绕有牵引绳。本发明利用BIM进行模型创建可以更直观的显示构件的造型,模型深化可以更好的方便施工,协调功能应用可以提前解决各个构件、管线等方面的碰撞问题,降低施工难度,保证施工质量。
Infilled wall construction device and construction method based on BIM (Building Information Modeling)
The invention discloses a BIM-based infilled wall construction device and method.The infilled wall construction device comprises two supporting rods, a cross beam and a guide wheel, the cross beam is arranged between the tops of the two supporting rods, the guide wheel is arranged in the middle of the bottom of the cross beam, and a first supporting column is arranged on the lower middle portion of each supporting rod; a guide roller is arranged on the first supporting column, a motor is arranged on one side of the guide roller, and a traction rope is wound on the guide roller. According to the method, modeling of the components can be displayed more visually by utilizing BIM for model creation, construction can be better facilitated through model deepening, the collision problem of all the components, pipelines and the like can be solved in advance by coordinating function application, the construction difficulty is reduced, and the construction quality is guaranteed.
本发明公开了一种基于BIM的填充墙施工装置及施工方法,其中,该填充墙施工装置包括支杆、横梁和导线轮,支杆为两个,并在两个支杆的顶部之间设置有横梁,横梁底部的中间设置有导向轮,支杆的中下部设置有第一支柱,第一支柱上设置有导线辊,导向辊的一侧设置有电机,导向辊上缠绕有牵引绳。本发明利用BIM进行模型创建可以更直观的显示构件的造型,模型深化可以更好的方便施工,协调功能应用可以提前解决各个构件、管线等方面的碰撞问题,降低施工难度,保证施工质量。
Infilled wall construction device and construction method based on BIM (Building Information Modeling)
一种基于BIM的填充墙施工装置及施工方法
LI FANG (author) / ZHU GUANGTAO (author) / GUAN XIANGTAO (author) / REN MENGNAN (author) / GAO ZHENKAI (author) / XUAN SHENGWEI (author) / ZHANG JUNJIE (author) / ZHANG QIANG (author) / LI XUELU (author) / TIAN CHANGYOU (author)
2023-08-08
Patent
Electronic Resource
Chinese
Framework building infilled wall construction method and construction device
European Patent Office | 2023
|Pipeline laying and infilled wall building integrated construction method
European Patent Office | 2021
|European Patent Office | 2023
|Secondary structure infilled wall construction equipment
European Patent Office | 2024
|European Patent Office | 2023
|