Construction method of ecological revetment
The invention discloses a construction method of an ecological revetment. The construction method comprises the following steps: a, preparation before construction; b, digging a foundation trench; c, laying a foundation trench; d, mounting a limiting seat; and e, arranging a planting groove. According to the construction method, the revetment along the line is subjected to division and segmented construction, firstly, a retention wall is arranged, water of a river channel is separated from a construction section, then a foundation trench is dug and leveled, then geotextile is laid on the surface of the foundation trench in a segmented mode through a laying trolley, one end corresponding to the geotextile laid later is pressed on the geotextile laid before, and the geotextile laid later is pressed on the geotextile laid later. Seamless connection of laying of the geotechnical cloth is guaranteed, a gravel layer is filled after laying of the geotechnical cloth is completed, then a reinforcing mesh is erected on the gravel layer, and a concrete layer is poured, so that the structural strength of the revetment is guaranteed, limiting blocks at the bottom of a limiting seat are inserted into limiting holes for positioning and mounting, and then a mounting frame and a grating are mounted on the concrete layer. The mounting frame is divided into a plurality of planting grooves through the grids, and the planting grooves are used for planting green plants.
本发明公开了一种生态护岸的施工方法,包括步骤:a、施工前准备;b、挖设基槽;c、基槽铺设;d、限位座的安装;e、种植槽的设置。本发明通过对沿线护岸进行划分,分段施工,首先设置挡水墙,将河道的水与施工段分隔,再挖设基槽,并将基槽整平,其次通过铺设小车分段对基槽表面铺设土工布,后铺设的土工布对应的一端压紧在前铺设的土工布上,保证土工布之间铺设无缝衔接,土工布铺设完成后填入砂石层,再在砂石层上架设钢筋网,并浇筑混凝土层,保证了护岸的结构强度,通过将限位座底部的限位块插入到限位孔中进行定位安装,然后将安装框与格栅安装在混凝土层上,格栅将安装框分割成若干种植槽,种植槽用于种植绿植。
Construction method of ecological revetment
The invention discloses a construction method of an ecological revetment. The construction method comprises the following steps: a, preparation before construction; b, digging a foundation trench; c, laying a foundation trench; d, mounting a limiting seat; and e, arranging a planting groove. According to the construction method, the revetment along the line is subjected to division and segmented construction, firstly, a retention wall is arranged, water of a river channel is separated from a construction section, then a foundation trench is dug and leveled, then geotextile is laid on the surface of the foundation trench in a segmented mode through a laying trolley, one end corresponding to the geotextile laid later is pressed on the geotextile laid before, and the geotextile laid later is pressed on the geotextile laid later. Seamless connection of laying of the geotechnical cloth is guaranteed, a gravel layer is filled after laying of the geotechnical cloth is completed, then a reinforcing mesh is erected on the gravel layer, and a concrete layer is poured, so that the structural strength of the revetment is guaranteed, limiting blocks at the bottom of a limiting seat are inserted into limiting holes for positioning and mounting, and then a mounting frame and a grating are mounted on the concrete layer. The mounting frame is divided into a plurality of planting grooves through the grids, and the planting grooves are used for planting green plants.
本发明公开了一种生态护岸的施工方法,包括步骤:a、施工前准备;b、挖设基槽;c、基槽铺设;d、限位座的安装;e、种植槽的设置。本发明通过对沿线护岸进行划分,分段施工,首先设置挡水墙,将河道的水与施工段分隔,再挖设基槽,并将基槽整平,其次通过铺设小车分段对基槽表面铺设土工布,后铺设的土工布对应的一端压紧在前铺设的土工布上,保证土工布之间铺设无缝衔接,土工布铺设完成后填入砂石层,再在砂石层上架设钢筋网,并浇筑混凝土层,保证了护岸的结构强度,通过将限位座底部的限位块插入到限位孔中进行定位安装,然后将安装框与格栅安装在混凝土层上,格栅将安装框分割成若干种植槽,种植槽用于种植绿植。
Construction method of ecological revetment
一种生态护岸的施工方法
WANG DONGWU (author) / XU KANGWEI (author) / WEN XIAODONG (author) / WU YIN (author) / SONG HONG (author) / LUO YUANQIN (author) / YU JINHU (author)
2023-08-11
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|European Patent Office | 2023
|Ecological revetment for water conservancy project and construction method of ecological revetment
European Patent Office | 2022
|