A platform for research: civil engineering, architecture and urbanism
Construction device for preventing and treating cracks between concrete structure and infilled wall
The invention belongs to the field of prevention and treatment construction devices, and particularly relates to a prevention and treatment construction device for cracks between a concrete structure and an infilled wall, and provides the following scheme that the prevention and treatment construction device comprises a cart, a movable frame is fixedly mounted at the top of the cart, a prevention and treatment box is slidably connected to the inner side of the movable frame, and a concrete pump is fixedly mounted on the right side of the prevention and treatment box; a connecting pipe is fixedly installed on the right side of the concrete pump, a stirrer is fixedly installed on the top of the base, the right side of the connecting pipe is fixedly connected with the stirrer, and an electric push rod is fixedly installed on the top of the cart. The electric push rod can drive the prevention and control box to move upwards, meanwhile, the concrete pump is started, the concrete pump pumps concrete on the inner side of the stirring machine into the prevention and control box, then the concrete is discharged through the nozzle on the left side, and along with rising of the prevention and control box, gaps can be filled, and prevention and control of the gaps are achieved.
本发明属于防治施工装置领域,尤其是一种混凝土结构与填充墙间裂缝防治施工装置,现提出如下方案,其包括推车,所述推车的顶部固定安装有移动架,移动架的内侧滑动连接有防治箱,所述防治箱的右侧固定安装有混凝土泵,混凝土泵的右侧固定安装有连接管,底座的顶部固定安装有搅拌器,连接管的右侧与搅拌器固定连接,推车的顶部固定安装有电动推杆,本发明通过推动推车,使得防治箱移动到缝隙的前方,然后再启动电动推杆,电动推杆就可带动防治箱向上移动,并且同时启动混凝土泵,混凝土泵将搅拌机内侧的混凝土抽入到防治箱的内侧,然后由左侧的喷嘴排出,随着防治箱的上升,就可对缝隙进行填充,实现对缝隙的防治。
Construction device for preventing and treating cracks between concrete structure and infilled wall
The invention belongs to the field of prevention and treatment construction devices, and particularly relates to a prevention and treatment construction device for cracks between a concrete structure and an infilled wall, and provides the following scheme that the prevention and treatment construction device comprises a cart, a movable frame is fixedly mounted at the top of the cart, a prevention and treatment box is slidably connected to the inner side of the movable frame, and a concrete pump is fixedly mounted on the right side of the prevention and treatment box; a connecting pipe is fixedly installed on the right side of the concrete pump, a stirrer is fixedly installed on the top of the base, the right side of the connecting pipe is fixedly connected with the stirrer, and an electric push rod is fixedly installed on the top of the cart. The electric push rod can drive the prevention and control box to move upwards, meanwhile, the concrete pump is started, the concrete pump pumps concrete on the inner side of the stirring machine into the prevention and control box, then the concrete is discharged through the nozzle on the left side, and along with rising of the prevention and control box, gaps can be filled, and prevention and control of the gaps are achieved.
本发明属于防治施工装置领域,尤其是一种混凝土结构与填充墙间裂缝防治施工装置,现提出如下方案,其包括推车,所述推车的顶部固定安装有移动架,移动架的内侧滑动连接有防治箱,所述防治箱的右侧固定安装有混凝土泵,混凝土泵的右侧固定安装有连接管,底座的顶部固定安装有搅拌器,连接管的右侧与搅拌器固定连接,推车的顶部固定安装有电动推杆,本发明通过推动推车,使得防治箱移动到缝隙的前方,然后再启动电动推杆,电动推杆就可带动防治箱向上移动,并且同时启动混凝土泵,混凝土泵将搅拌机内侧的混凝土抽入到防治箱的内侧,然后由左侧的喷嘴排出,随着防治箱的上升,就可对缝隙进行填充,实现对缝隙的防治。
Construction device for preventing and treating cracks between concrete structure and infilled wall
一种混凝土结构与填充墙间裂缝防治施工装置
SHEN XIALEI (author)
2023-08-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Control and construction method for aerated concrete block infilled wall cracks
European Patent Office | 2020
|Secondary structure infilled wall construction equipment
European Patent Office | 2024
|Sill coping concrete structure of frame structure infilled wall and construction method
European Patent Office | 2015
|European Patent Office | 2021
|High-ductility concrete sliding infilled wall frame structure and construction method thereof
European Patent Office | 2020
|