Guide box culvert construction method
The invention discloses a construction method of a diversion box culvert. The construction method comprises the following steps: 1, obtaining a plurality of prefabricated diversion half box culverts; secondly, the multiple prefabricated diversion half box culverts are transported to a construction site; and 3, carrying out on-site butt joint and sealing treatment on the plurality of prefabricated diversion half box culverts. According to the construction method, the semi-prefabricated diversion box culvert formwork corresponding to the prefabricated diversion box culvert is constructed, when the formwork is used, the top plates in the diversion box culvert end formworks on the two sides are rotationally matched with the tops of the wall plates, the opening range of the semi-prefabricated diversion box culvert formwork can be effectively expanded, and a steel reinforcement framework can be conveniently hoisted and put in; and meanwhile, the side plates and the top plates in the diversion box culvert end molds on the two sides are automatically opened and closed, operation is more convenient and labor-saving, the semi-prefabricating efficiency of the diversion box culvert is high, and then the construction period of the diversion box culvert is guaranteed.
本发明公开了一种导流箱涵施工方法,包括步骤:一、获取多个预制导流半箱涵;二、将多个预制导流半箱涵运输至施工现场;三、多个预制导流半箱涵现场对接及密封处理。本发明通过构建预制导流半箱涵对应的半预制导流箱涵模板,模板使用时,两侧的导流箱涵端模中顶板和壁板的顶部转动配合,可有效扩展半预制导流箱涵模板的开口范围,便于钢筋骨架吊运放入,同时两侧的导流箱涵端模中侧板和顶板的自动开启和关闭,操作起来更加的方便和省力,导流箱涵半预制效率高,进而保证导流箱涵施工工期。
Guide box culvert construction method
The invention discloses a construction method of a diversion box culvert. The construction method comprises the following steps: 1, obtaining a plurality of prefabricated diversion half box culverts; secondly, the multiple prefabricated diversion half box culverts are transported to a construction site; and 3, carrying out on-site butt joint and sealing treatment on the plurality of prefabricated diversion half box culverts. According to the construction method, the semi-prefabricated diversion box culvert formwork corresponding to the prefabricated diversion box culvert is constructed, when the formwork is used, the top plates in the diversion box culvert end formworks on the two sides are rotationally matched with the tops of the wall plates, the opening range of the semi-prefabricated diversion box culvert formwork can be effectively expanded, and a steel reinforcement framework can be conveniently hoisted and put in; and meanwhile, the side plates and the top plates in the diversion box culvert end molds on the two sides are automatically opened and closed, operation is more convenient and labor-saving, the semi-prefabricating efficiency of the diversion box culvert is high, and then the construction period of the diversion box culvert is guaranteed.
本发明公开了一种导流箱涵施工方法,包括步骤:一、获取多个预制导流半箱涵;二、将多个预制导流半箱涵运输至施工现场;三、多个预制导流半箱涵现场对接及密封处理。本发明通过构建预制导流半箱涵对应的半预制导流箱涵模板,模板使用时,两侧的导流箱涵端模中顶板和壁板的顶部转动配合,可有效扩展半预制导流箱涵模板的开口范围,便于钢筋骨架吊运放入,同时两侧的导流箱涵端模中侧板和顶板的自动开启和关闭,操作起来更加的方便和省力,导流箱涵半预制效率高,进而保证导流箱涵施工工期。
Guide box culvert construction method
一种导流箱涵施工方法
QI XIAOLIANG (author) / TAN LONG (author) / LEI HANXUN (author) / ZHENG HAO (author) / LIU WEIXING (author) / ZHAO ZHENGPING (author) / SU SHUAI (author) / GUO DONG (author) / HU YUEHENG (author) / WANG YAQUAN (author)
2023-08-18
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Pollution discharge box culvert, box culvert construction method and box culvert repairing method
European Patent Office | 2020
|Box culvert construction method and box culvert structure
European Patent Office | 2024
|NTIS | 2009
|