Collapsible loess site leveling method
The invention belongs to the technical field of foundation treatment, and particularly relates to a collapsible loess site leveling method which comprises the following specific steps: digging a soil layer: digging the ground of a loess site by using a digging machine, and transporting loess generated by digging away through a transport vehicle, the digging depth is controlled to be 2-3 meters; soaking treatment: preparing a vehicle for conveying water, adding acetic acid into the water, mixing, calculating the amount of acetic acid mixed into the water and the volume of the place needing to be watered, then uniformly spraying the mixture to the upper end of the loess place, ensuring that the water amount at the upper end of the place is sufficient, continuously watering after the water completely permeates into the place until all the water is used up, and stopping watering; the whole process lasts for 2-4 days, so that in the later use process of the field, even if the field is brewed with rainwater for a long time, the field cannot be collapsed, and the field can also be kept flat.
本发明属于地基处理技术领域,具体为一种湿陷性黄土场地整平方法,该湿陷性黄土场地整平方法的具体步骤流程如下:土层挖除:通过使用挖掘机器对黄土场地的地面进行挖掘,并将挖掘产生的黄土通过运输车运走,挖掘的深度控制在2‑3米;浸水处理:准备一个运送水的车辆,并在水中加入乙酸并混合,需要计算好加入水中混入乙酸的量和这块场地需要浇水的体积,然后均匀洒在黄土场地的上端,需要保证场地上端的水量充足,当水完全渗入场地后,继续浇水,直至所有的水用完,整个过程用时2‑4天,使得场地在后期使用的过程中,即使长时间受到雨水的冲泡,也不会湿陷,场地也可以保持平整。
Collapsible loess site leveling method
The invention belongs to the technical field of foundation treatment, and particularly relates to a collapsible loess site leveling method which comprises the following specific steps: digging a soil layer: digging the ground of a loess site by using a digging machine, and transporting loess generated by digging away through a transport vehicle, the digging depth is controlled to be 2-3 meters; soaking treatment: preparing a vehicle for conveying water, adding acetic acid into the water, mixing, calculating the amount of acetic acid mixed into the water and the volume of the place needing to be watered, then uniformly spraying the mixture to the upper end of the loess place, ensuring that the water amount at the upper end of the place is sufficient, continuously watering after the water completely permeates into the place until all the water is used up, and stopping watering; the whole process lasts for 2-4 days, so that in the later use process of the field, even if the field is brewed with rainwater for a long time, the field cannot be collapsed, and the field can also be kept flat.
本发明属于地基处理技术领域,具体为一种湿陷性黄土场地整平方法,该湿陷性黄土场地整平方法的具体步骤流程如下:土层挖除:通过使用挖掘机器对黄土场地的地面进行挖掘,并将挖掘产生的黄土通过运输车运走,挖掘的深度控制在2‑3米;浸水处理:准备一个运送水的车辆,并在水中加入乙酸并混合,需要计算好加入水中混入乙酸的量和这块场地需要浇水的体积,然后均匀洒在黄土场地的上端,需要保证场地上端的水量充足,当水完全渗入场地后,继续浇水,直至所有的水用完,整个过程用时2‑4天,使得场地在后期使用的过程中,即使长时间受到雨水的冲泡,也不会湿陷,场地也可以保持平整。
Collapsible loess site leveling method
一种湿陷性黄土场地整平方法
SONG WEI (author) / SONG HONGYING (author) / ZHOU SHIPING (author)
2023-08-18
Patent
Electronic Resource
Chinese