A platform for research: civil engineering, architecture and urbanism
Fabricated building wall and construction method
The invention relates to an assembly type building wall and a construction method, according to the main technical scheme, the assembly type building wall comprises a plurality of assembly bodies, and each assembly body comprises a mounting frame, a plurality of prefabricated wall plates located in the mounting frame and at least two connecting rib pipes arranged up and down; the side faces of every two adjacent prefabricated wall plates are attached, the prefabricated wall plates are provided with penetrating holes allowing the connecting rib pipes to horizontally penetrate through, the connecting rib pipes of every two adjacent assembly bodies are arranged in a staggered mode in the thickness direction of the prefabricated wall plates, and the connecting rib pipes are provided with variable filling steel structure assemblies used for abutting against the inner walls of the penetrating holes. The connecting rib pipe is provided with a slurry outlet hole positioned in the through hole; a pouring cavity is jointly defined by the opposite faces of every two adjacent mounting frames and the side plates, and pouring auxiliary parts are arranged at the ends of the connecting rib pipes and used for allowing mortar to enter the connecting rib pipes. The method has the effect of shortening the construction period.
本申请涉及一种装配式建筑墙体及施工方法,其中主要技术方案为一种装配式建筑墙体,其包括多个装配主体,所述装配主体包括安装框架、多个位于安装框架内的预制墙板和至少两根上下排布的连接筋管,相邻两个预制墙板的侧面相贴合,所述预制墙板开设供所述连接筋管水平穿设的穿孔,相邻两个装配主体的连接筋管沿所述预制墙板厚度方向错位设置,所述连接筋管设有用于抵接穿孔内壁的可变填充钢构组件,连接筋管设有位于穿孔内的出浆孔;相邻两个安装框架的相对面和侧板共同合围形成浇筑腔,所述连接筋管的端部设有浇筑辅助件,浇筑辅助件用于供砂浆进入连接筋管内。本申请具有缩短施工周期的效果。
Fabricated building wall and construction method
The invention relates to an assembly type building wall and a construction method, according to the main technical scheme, the assembly type building wall comprises a plurality of assembly bodies, and each assembly body comprises a mounting frame, a plurality of prefabricated wall plates located in the mounting frame and at least two connecting rib pipes arranged up and down; the side faces of every two adjacent prefabricated wall plates are attached, the prefabricated wall plates are provided with penetrating holes allowing the connecting rib pipes to horizontally penetrate through, the connecting rib pipes of every two adjacent assembly bodies are arranged in a staggered mode in the thickness direction of the prefabricated wall plates, and the connecting rib pipes are provided with variable filling steel structure assemblies used for abutting against the inner walls of the penetrating holes. The connecting rib pipe is provided with a slurry outlet hole positioned in the through hole; a pouring cavity is jointly defined by the opposite faces of every two adjacent mounting frames and the side plates, and pouring auxiliary parts are arranged at the ends of the connecting rib pipes and used for allowing mortar to enter the connecting rib pipes. The method has the effect of shortening the construction period.
本申请涉及一种装配式建筑墙体及施工方法,其中主要技术方案为一种装配式建筑墙体,其包括多个装配主体,所述装配主体包括安装框架、多个位于安装框架内的预制墙板和至少两根上下排布的连接筋管,相邻两个预制墙板的侧面相贴合,所述预制墙板开设供所述连接筋管水平穿设的穿孔,相邻两个装配主体的连接筋管沿所述预制墙板厚度方向错位设置,所述连接筋管设有用于抵接穿孔内壁的可变填充钢构组件,连接筋管设有位于穿孔内的出浆孔;相邻两个安装框架的相对面和侧板共同合围形成浇筑腔,所述连接筋管的端部设有浇筑辅助件,浇筑辅助件用于供砂浆进入连接筋管内。本申请具有缩短施工周期的效果。
Fabricated building wall and construction method
一种装配式建筑墙体及施工方法
ZHAO JIEQIONG (author) / ZHANG MENG (author) / CAI GUOJIE (author) / YE XU (author) / ZHANG BOWEI (author) / GUO RUIXUAN (author) / ZUO JINGJING (author) / QIAO TONG (author) / WANG BO (author) / JIN LE (author)
2023-08-18
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated wall building block and fabricated construction method of wall building block
European Patent Office | 2020
|Fabricated building block, fabricated building block wall and construction method of wall
European Patent Office | 2015
|