Reinforced concrete inner frame device of old multi-layer brick-concrete structure building and construction method of reinforced concrete inner frame device
The invention provides a reinforced concrete inner frame device of an old multi-layer brick-concrete structure building and a construction method of the reinforced concrete inner frame device, and relates to the technical field of reinforced concrete inner frames. The problems that in the prior art, a whole reinforcement cage is generally hoisted and covered through an external crane or constructed on the outer side of a brick-concrete structure in a manual binding mode through manual climbing, however, due to the fact that the hoisting and binding modes can be used only through supporting of large equipment, limitation exists are solved. A traction rope B is wound by a roller B, so that the reinforcing steel bar frame on the supporting frame is quickly pulled towards the inner side of the guide rail, and the reinforcing steel bar frame on the supporting frame can be quickly arranged on the outer side of the base in a covering manner; by means of the design, on the premise that large machines are not used for hoisting, batch steel bar frames can be rapidly assembled, and then the purpose of being more practical is achieved.
本发明提供旧有多层砖混结构建筑钢筋混凝土内框装置及其施工方法,涉及钢筋混凝土内框技术领域,移动架的左侧固定连接有挂钩B,挂钩B与牵引绳B相连接,解决了现有的一般为通过外部的吊车将整体钢筋笼进行吊装罩设或通过人工登高来进行手动捆扎的方式在砖混结构的外侧进行建造,但由于吊装以及捆扎的方式其需要依靠大型设备的支撑才能实现使用,进而存在着局限性的问题,通过滚轮B对牵引绳B的收卷来实现将位于支撑架之上的钢筋架快速的向着导轨的内侧进行拉扯,使得位于支撑架之上的钢筋架可以快速的罩设到底座的外侧位置,该设计可以实现在不利用大型机械进行吊装的前提下快速的对批量的钢筋架进行快速的装配作业,进而达到更加实用的目的。
Reinforced concrete inner frame device of old multi-layer brick-concrete structure building and construction method of reinforced concrete inner frame device
The invention provides a reinforced concrete inner frame device of an old multi-layer brick-concrete structure building and a construction method of the reinforced concrete inner frame device, and relates to the technical field of reinforced concrete inner frames. The problems that in the prior art, a whole reinforcement cage is generally hoisted and covered through an external crane or constructed on the outer side of a brick-concrete structure in a manual binding mode through manual climbing, however, due to the fact that the hoisting and binding modes can be used only through supporting of large equipment, limitation exists are solved. A traction rope B is wound by a roller B, so that the reinforcing steel bar frame on the supporting frame is quickly pulled towards the inner side of the guide rail, and the reinforcing steel bar frame on the supporting frame can be quickly arranged on the outer side of the base in a covering manner; by means of the design, on the premise that large machines are not used for hoisting, batch steel bar frames can be rapidly assembled, and then the purpose of being more practical is achieved.
本发明提供旧有多层砖混结构建筑钢筋混凝土内框装置及其施工方法,涉及钢筋混凝土内框技术领域,移动架的左侧固定连接有挂钩B,挂钩B与牵引绳B相连接,解决了现有的一般为通过外部的吊车将整体钢筋笼进行吊装罩设或通过人工登高来进行手动捆扎的方式在砖混结构的外侧进行建造,但由于吊装以及捆扎的方式其需要依靠大型设备的支撑才能实现使用,进而存在着局限性的问题,通过滚轮B对牵引绳B的收卷来实现将位于支撑架之上的钢筋架快速的向着导轨的内侧进行拉扯,使得位于支撑架之上的钢筋架可以快速的罩设到底座的外侧位置,该设计可以实现在不利用大型机械进行吊装的前提下快速的对批量的钢筋架进行快速的装配作业,进而达到更加实用的目的。
Reinforced concrete inner frame device of old multi-layer brick-concrete structure building and construction method of reinforced concrete inner frame device
旧有多层砖混结构建筑钢筋混凝土内框装置及其施工方法
LIAO ZAILUN (author) / YANG ZHENGMAO (author) / YANG LEI (author) / WEI JIAN (author) / WU YUANJIN (author) / JIA JIANXIANG (author) / YAO ZHIGANG (author) / WANG WEI (author) / ZHANG YURONG (author) / XU GUOJIE (author)
2023-08-22
Patent
Electronic Resource
Chinese