A platform for research: civil engineering, architecture and urbanism
Novel bolt connection adjustable square steel tube cantilever scaffold and construction method
The invention discloses a novel bolt connection adjustable square steel tube cantilever scaffold and a construction method, and relates to the technical field of building construction. The novel bolt connection adjustable square steel tube cantilever scaffold comprises a square steel tube, a first connecting steel plate, a second high-strength bolt, a scaffold vertical rod sleeve, a scaffold vertical rod and a second connecting steel plate. According to the novel bolt connection adjustable square steel tube cantilever scaffold and the construction method, the square steel tubes are adopted as cantilever bearing structures, the structure is relatively simple, and the stability of the scaffold vertical rods on the square steel tubes is superior to that of traditional I-shaped steel. One end of the square steel tube is fixedly connected with the building outer wall through the first high-strength fixing bolt, and the lower side of the square steel tube is connected with the circular steel tube inclined strut to support the square steel tube, so that on one hand, the square steel tube cantilever scaffold can be stably fixed on the building outer wall, and on the other hand, damage of the lap joint scaffold to the building outer wall is reduced to a great extent.
本发明公开了一种新型螺栓连接可调节方钢管悬挑脚手架及施工方法,涉及建筑施工技术领域。该新型螺栓连接可调节方钢管悬挑脚手架,包括方钢管、第一连接钢板、第二高强螺栓、脚手架立杆套筒、脚手架立杆、第二连接钢板。该新型螺栓连接可调节方钢管悬挑脚手架及施工方法,采用方钢管作为悬挑承载结构形式,结构相对简单,脚手架立杆在方钢管上的稳定性要优于传统工字钢。方钢管的一端与建筑外墙通过第一高强固定螺栓进行固定连接,下侧通过与圆钢管斜撑的连接将方钢管进行支撑,这样一方面方钢管悬挑脚手架能够稳定的固定在建筑外墙,另一方面,搭接脚手架对建筑外墙的损害也被很大程度的减小。
Novel bolt connection adjustable square steel tube cantilever scaffold and construction method
The invention discloses a novel bolt connection adjustable square steel tube cantilever scaffold and a construction method, and relates to the technical field of building construction. The novel bolt connection adjustable square steel tube cantilever scaffold comprises a square steel tube, a first connecting steel plate, a second high-strength bolt, a scaffold vertical rod sleeve, a scaffold vertical rod and a second connecting steel plate. According to the novel bolt connection adjustable square steel tube cantilever scaffold and the construction method, the square steel tubes are adopted as cantilever bearing structures, the structure is relatively simple, and the stability of the scaffold vertical rods on the square steel tubes is superior to that of traditional I-shaped steel. One end of the square steel tube is fixedly connected with the building outer wall through the first high-strength fixing bolt, and the lower side of the square steel tube is connected with the circular steel tube inclined strut to support the square steel tube, so that on one hand, the square steel tube cantilever scaffold can be stably fixed on the building outer wall, and on the other hand, damage of the lap joint scaffold to the building outer wall is reduced to a great extent.
本发明公开了一种新型螺栓连接可调节方钢管悬挑脚手架及施工方法,涉及建筑施工技术领域。该新型螺栓连接可调节方钢管悬挑脚手架,包括方钢管、第一连接钢板、第二高强螺栓、脚手架立杆套筒、脚手架立杆、第二连接钢板。该新型螺栓连接可调节方钢管悬挑脚手架及施工方法,采用方钢管作为悬挑承载结构形式,结构相对简单,脚手架立杆在方钢管上的稳定性要优于传统工字钢。方钢管的一端与建筑外墙通过第一高强固定螺栓进行固定连接,下侧通过与圆钢管斜撑的连接将方钢管进行支撑,这样一方面方钢管悬挑脚手架能够稳定的固定在建筑外墙,另一方面,搭接脚手架对建筑外墙的损害也被很大程度的减小。
Novel bolt connection adjustable square steel tube cantilever scaffold and construction method
一种新型螺栓连接可调节方钢管悬挑脚手架及施工方法
ZHU YAN (author) / XU BIN (author) / YANG GUOWEI (author) / YU JINZHEN (author) / YE ZIMENG (author) / LU XIXIN (author) / QIAN HAO (author)
2023-08-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Bolt type I-shaped steel cantilever scaffold construction method
European Patent Office | 2021
|Anchor bolt sleeve and recyclable cantilever scaffold anchor bolt construction method
European Patent Office | 2020
|Cantilever scaffold I-steel anti-falling anchor bolt structure and construction method
European Patent Office | 2024
|Cantilever scaffold anchor bolt structure and installation method
European Patent Office | 2020
|Novel cantilever steel scaffold and construction process thereof
European Patent Office | 2021
|