A platform for research: civil engineering, architecture and urbanism
Assembly type prefabricated integral bathroom
The invention relates to an assembly type prefabricated integral bathroom which comprises a bottom plate, a wall plate and a top plate and further comprises an installation framework fixed to a building wall, and the installation framework is provided with a fixing assembly used for fixing the top plate and a plurality of installation mechanisms used for fixing the wall plate to the installation framework. The sealing structure further comprises a sealing strip, the sealing strip is used for being installed in a gap between two adjacent wallboards or a gap between the wallboard and the bottom plate, two elastic steel sheets are fixedly arranged on the sealing strip, and rubber sealing gaskets are arranged at the ends, away from each other, of the two elastic steel sheets. The sealing strip is provided with a driving assembly used for driving the two elastic steel sheets to deflect in the direction away from each other. The integral bathroom has the effect that in the using process of the integral bathroom, water seepage, water leakage and the like are not prone to occurring between the base plate and the wallboards and between the wallboards.
本申请涉及一种装配式预制整体卫浴,其包括底板、墙板和顶板,还包括固定在建筑墙体上的安装骨架,所述安装骨架上设置有用于固定顶板的固定组件,以及多个用于将墙板固定在安装骨架上的安装机构;还包括密封条,所述密封条用于安装在相邻两墙板之间缝隙处或墙板与底板之间的缝隙处,所述密封条上固定设置有两个弹性钢片,两所述弹性钢片相互远离的一端均设置有橡胶密封垫,所述密封条上设置有用于驱使两弹性钢片沿相互远离方向偏转的驱动组件。本申请具有整体式卫浴在使用的过程中,底盘及墙板之间、以及墙板与墙板之间缝隙处不易出现渗水、漏水等情况的效果。
Assembly type prefabricated integral bathroom
The invention relates to an assembly type prefabricated integral bathroom which comprises a bottom plate, a wall plate and a top plate and further comprises an installation framework fixed to a building wall, and the installation framework is provided with a fixing assembly used for fixing the top plate and a plurality of installation mechanisms used for fixing the wall plate to the installation framework. The sealing structure further comprises a sealing strip, the sealing strip is used for being installed in a gap between two adjacent wallboards or a gap between the wallboard and the bottom plate, two elastic steel sheets are fixedly arranged on the sealing strip, and rubber sealing gaskets are arranged at the ends, away from each other, of the two elastic steel sheets. The sealing strip is provided with a driving assembly used for driving the two elastic steel sheets to deflect in the direction away from each other. The integral bathroom has the effect that in the using process of the integral bathroom, water seepage, water leakage and the like are not prone to occurring between the base plate and the wallboards and between the wallboards.
本申请涉及一种装配式预制整体卫浴,其包括底板、墙板和顶板,还包括固定在建筑墙体上的安装骨架,所述安装骨架上设置有用于固定顶板的固定组件,以及多个用于将墙板固定在安装骨架上的安装机构;还包括密封条,所述密封条用于安装在相邻两墙板之间缝隙处或墙板与底板之间的缝隙处,所述密封条上固定设置有两个弹性钢片,两所述弹性钢片相互远离的一端均设置有橡胶密封垫,所述密封条上设置有用于驱使两弹性钢片沿相互远离方向偏转的驱动组件。本申请具有整体式卫浴在使用的过程中,底盘及墙板之间、以及墙板与墙板之间缝隙处不易出现渗水、漏水等情况的效果。
Assembly type prefabricated integral bathroom
一种装配式预制整体卫浴
ZHANG JILEI (author) / XU GUANGJUN (author) / LING FEN (author) / QI HENGHAO (author) / HE JIACHENG (author)
2023-08-22
Patent
Electronic Resource
Chinese