A platform for research: civil engineering, architecture and urbanism
Temporary fixing and supporting device for large pipeline and temporary supporting method for pipeline
The invention discloses a large pipeline temporary fixing and supporting device and a pipeline temporary supporting method, which realize high efficiency of large pipeline temporary fixing and supporting operation, avoid complicated workload of building and erecting steel pipes, save construction cost and improve overall construction efficiency of a construction site on the premise of meeting convenient, safe and reliable construction. The problems of dust pollution on a construction site, occupation of a large amount of labor force, pneumoconiosis of workers, numerous potential safety hazards existing in supporting of a large pipeline frame body and the like are solved. Meanwhile, turnover utilization of the support is achieved, the overall requirements of current green construction and green building are completely met, the related problems are effectively solved, meanwhile, the utilization rate of related materials is greatly increased, and the cost is greatly reduced. The problems that an existing pipeline temporary supporting mode is long in building time, and potential safety hazards exist in assembly and disassembly are solved.
本发明公开了一种大型管道临时固定支撑装置及管道临时支撑方法,在满足施工便捷、安全可靠的前提下,实现了大型管道临时固定支撑作业的高效性,避免砌筑和搭设钢管的繁杂工作量,节约施工成本,提高了工地整体的施工效率,解决了施工现场扬尘污染、占用大量劳动力、工人尘肺病、大型管道架体支设存在诸多安全隐患等问题。同时,该支撑实现了周转利用,完全符合当下绿色施工,绿色建造的整体要求,有效解决相关难题的同时,使相关材料的利用率大幅度提升,成本大幅度降低。本发明解决了现有的管道临时支撑方式存在砌筑时间长,且安拆存在安全隐患的问题。
Temporary fixing and supporting device for large pipeline and temporary supporting method for pipeline
The invention discloses a large pipeline temporary fixing and supporting device and a pipeline temporary supporting method, which realize high efficiency of large pipeline temporary fixing and supporting operation, avoid complicated workload of building and erecting steel pipes, save construction cost and improve overall construction efficiency of a construction site on the premise of meeting convenient, safe and reliable construction. The problems of dust pollution on a construction site, occupation of a large amount of labor force, pneumoconiosis of workers, numerous potential safety hazards existing in supporting of a large pipeline frame body and the like are solved. Meanwhile, turnover utilization of the support is achieved, the overall requirements of current green construction and green building are completely met, the related problems are effectively solved, meanwhile, the utilization rate of related materials is greatly increased, and the cost is greatly reduced. The problems that an existing pipeline temporary supporting mode is long in building time, and potential safety hazards exist in assembly and disassembly are solved.
本发明公开了一种大型管道临时固定支撑装置及管道临时支撑方法,在满足施工便捷、安全可靠的前提下,实现了大型管道临时固定支撑作业的高效性,避免砌筑和搭设钢管的繁杂工作量,节约施工成本,提高了工地整体的施工效率,解决了施工现场扬尘污染、占用大量劳动力、工人尘肺病、大型管道架体支设存在诸多安全隐患等问题。同时,该支撑实现了周转利用,完全符合当下绿色施工,绿色建造的整体要求,有效解决相关难题的同时,使相关材料的利用率大幅度提升,成本大幅度降低。本发明解决了现有的管道临时支撑方式存在砌筑时间长,且安拆存在安全隐患的问题。
Temporary fixing and supporting device for large pipeline and temporary supporting method for pipeline
大型管道临时固定支撑装置及管道临时支撑方法
ZHOU CHENGYING (author) / XU JIANGXUAN (author) / JI SHENGPEI (author) / LU YANG (author) / SHEN JUNYE (author)
2023-08-22
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Temporary supporting device for municipal engineering pipeline groove and construction method
European Patent Office | 2022
|Temporary supporting system and temporary supporting method for foundation reinforcement
European Patent Office | 2023
|