Construction method of small-curve-radius continuous steel box composite beam
The invention relates to the field of composite beam construction, and discloses a small-curve-radius continuous steel box composite beam construction method which comprises the following steps: step 1, constructing an abutment and a temporary buttress, and mounting a support on the abutment; 2, steel beam hoisting is completed, the central axis of a steel beam is a curve, and pushing equipment is debugged and installed on the abutment; thirdly, the steel beam is jacked by the jacking equipment, so that the hogging moment area of the steel beam is arched upwards; fourthly, a steel plate is arranged on the steel beam, the steel plate serves as a formwork, and concrete in the sagging moment area is poured; fifthly, after the concrete in the positive bending moment area reaches the design strength, the steel plate serves as a formwork, and concrete in the negative bending moment area is poured; therefore, the stress of the concrete structure in the hogging moment area can be conveniently and quickly optimized.
本发明涉及组合梁施工领域,公开了一种小曲线半径连续钢箱组合梁施工方法,包括以下步骤:步骤一、施工墩台和临时支墩,在墩台上安装支座;步骤二、完成钢梁吊装,钢梁中轴线为曲线,在墩台上调试并安装顶推设备;步骤三、顶推设备顶升钢梁,使钢梁的负弯矩区向上拱起;步骤四、钢梁上设有钢板,以钢板为模板,浇筑正弯矩区的混凝土;步骤五、正弯矩区的混凝土达到设计强度后,以钢板为模板,浇筑负弯矩区的混凝土;以方便快捷地优化负弯矩区的混凝土结构受力。
Construction method of small-curve-radius continuous steel box composite beam
The invention relates to the field of composite beam construction, and discloses a small-curve-radius continuous steel box composite beam construction method which comprises the following steps: step 1, constructing an abutment and a temporary buttress, and mounting a support on the abutment; 2, steel beam hoisting is completed, the central axis of a steel beam is a curve, and pushing equipment is debugged and installed on the abutment; thirdly, the steel beam is jacked by the jacking equipment, so that the hogging moment area of the steel beam is arched upwards; fourthly, a steel plate is arranged on the steel beam, the steel plate serves as a formwork, and concrete in the sagging moment area is poured; fifthly, after the concrete in the positive bending moment area reaches the design strength, the steel plate serves as a formwork, and concrete in the negative bending moment area is poured; therefore, the stress of the concrete structure in the hogging moment area can be conveniently and quickly optimized.
本发明涉及组合梁施工领域,公开了一种小曲线半径连续钢箱组合梁施工方法,包括以下步骤:步骤一、施工墩台和临时支墩,在墩台上安装支座;步骤二、完成钢梁吊装,钢梁中轴线为曲线,在墩台上调试并安装顶推设备;步骤三、顶推设备顶升钢梁,使钢梁的负弯矩区向上拱起;步骤四、钢梁上设有钢板,以钢板为模板,浇筑正弯矩区的混凝土;步骤五、正弯矩区的混凝土达到设计强度后,以钢板为模板,浇筑负弯矩区的混凝土;以方便快捷地优化负弯矩区的混凝土结构受力。
Construction method of small-curve-radius continuous steel box composite beam
一种小曲线半径连续钢箱组合梁施工方法
CAO MINGRUI (author) / CHAI SHAOQIANG (author) / ZHAO YANLU (author) / REN JIMIN (author) / LEI SHANGCHENG (author)
2023-08-25
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of small-radius curve precast slab beam
European Patent Office | 2022
|Pushing beam falling construction method for small-radius curve steel box beam overpass bridge
European Patent Office | 2024
|Small-radius curve cast-in-place continuous box girder construction method
European Patent Office | 2022
|Large-span small-radius continuous beam bridge construction method
European Patent Office | 2021
|