The invention discloses a water supply and drainage pipeline construction method and device, and the method specifically comprises the following steps: 1, selecting proper pipeline materials according to the needs of a drainage system, including PVC, PE, PP plastic materials or glass fiber reinforced plastics; secondly, a groove is dug in the pipeline installation position, the width of the groove is 2-3 times of the diameter of the pipeline, and the depth of the groove needs to be measured according to the actual ground height; thirdly, a proper cushion layer material is laid in the groove, a cushion layer is subjected to trowelling treatment through a cushion layer trowelling device, and a proper amount of bent corners and supports are arranged on the cushion layer according to the requirement of a drainage system; the construction period is short, the construction difficulty is low, and the construction efficiency is improved; the pipeline is made of materials such as high-strength plastic or glass fiber reinforced plastic, and is high in durability and long in service life; the construction quality is reliable, the problems of leakage, blockage and the like are not easy to occur, and the maintenance cost is reduced; and the pipeline is more convenient to maintain and repair, and the use convenience is improved.
本发明公开了一种给排水管道施工方法以及装置,具体包括如下步骤:步骤一:根据排水系统需要,选择适宜的管道材料,包括PVC、PE、PP塑料材料或玻璃钢;步骤二:在管道安装位置开挖沟槽,沟槽宽度按照管道的直径2~3倍,深度应根据实际地面高度进行测量;步骤三:在沟槽中铺设适宜的垫层材料,并通过垫层抹平装置对垫层进行抹平处理,在垫层上按照排水系统的需要,适量设置弯角和支架;施工周期短、施工难度小,提高了施工效率;管道采用高强度塑料或玻璃钢等材料制造,耐久性强,使用寿命长;施工质量可靠,不易出现渗漏和阻塞等问题,减少了维护成本;管道的维护和维修更加方便,增加了使用便捷性。
The invention discloses a water supply and drainage pipeline construction method and device, and the method specifically comprises the following steps: 1, selecting proper pipeline materials according to the needs of a drainage system, including PVC, PE, PP plastic materials or glass fiber reinforced plastics; secondly, a groove is dug in the pipeline installation position, the width of the groove is 2-3 times of the diameter of the pipeline, and the depth of the groove needs to be measured according to the actual ground height; thirdly, a proper cushion layer material is laid in the groove, a cushion layer is subjected to trowelling treatment through a cushion layer trowelling device, and a proper amount of bent corners and supports are arranged on the cushion layer according to the requirement of a drainage system; the construction period is short, the construction difficulty is low, and the construction efficiency is improved; the pipeline is made of materials such as high-strength plastic or glass fiber reinforced plastic, and is high in durability and long in service life; the construction quality is reliable, the problems of leakage, blockage and the like are not easy to occur, and the maintenance cost is reduced; and the pipeline is more convenient to maintain and repair, and the use convenience is improved.
本发明公开了一种给排水管道施工方法以及装置,具体包括如下步骤:步骤一:根据排水系统需要,选择适宜的管道材料,包括PVC、PE、PP塑料材料或玻璃钢;步骤二:在管道安装位置开挖沟槽,沟槽宽度按照管道的直径2~3倍,深度应根据实际地面高度进行测量;步骤三:在沟槽中铺设适宜的垫层材料,并通过垫层抹平装置对垫层进行抹平处理,在垫层上按照排水系统的需要,适量设置弯角和支架;施工周期短、施工难度小,提高了施工效率;管道采用高强度塑料或玻璃钢等材料制造,耐久性强,使用寿命长;施工质量可靠,不易出现渗漏和阻塞等问题,减少了维护成本;管道的维护和维修更加方便,增加了使用便捷性。
Water supply and drainage pipeline construction method and device
一种给排水管道施工方法以及装置
LENG YUE (author)
2023-08-25
Patent
Electronic Resource
Chinese
Municipal water supply and drainage pipeline construction device
European Patent Office | 2024
|Construction method of water supply and drainage pipeline
European Patent Office | 2021
|Groove backfilling device for water supply and drainage pipeline construction
European Patent Office | 2023
|Water supply and drainage engineering pipeline laying treatment construction method
European Patent Office | 2020
|