Temporary protection method in highway prefabricated small box girder bridge overpass railway construction process
The invention discloses a temporary protection method in a highway prefabricated small box girder bridge over-crossing railway construction process, which comprises the following steps: S1, prefabricating a box girder, fixing an embedded connecting piece at a set position of the box girder when reinforcement arrangement is completed and concrete is not poured, and enabling the outer end of the embedded connecting piece to extend out of the box girder; s2, after prefabrication of the box girder is completed, the steel mold is dismantled; s3, after the box girder is hoisted in place, a protective shed is erected at the outer end of the embedded connecting piece; s4, when a bridge wet joint is constructed, a working hole used for subsequently transporting out the dismantled protective shed material is reserved in the bridge joint; and S5, after the whole construction of the wet joint of the bridge is completed, the protective shed is dismantled. The connecting pieces are pre-buried when the box girder is prefabricated, the protective shed is erected on the pre-buried connecting pieces through the connecting structures, when the protective shed is dismantled, the dismantled protective shed materials can be transported out through the working holes, dismantling is convenient, the influence on a railway in the construction process of the prefabricated small box girder bridge is reduced, and it can be guaranteed that construction is safe, efficient and convenient.
本发明公开了一种公路预制小箱梁桥上跨铁路施工过程临时防护方法,包括:S1、预制箱梁,在完成布筋且未浇筑混凝土时,将预埋连接件固定在箱梁的设定位置上,且预埋连接件的外端伸出箱梁;S2、待箱梁预制完成后,拆除钢模;S3、将箱梁吊装就位后,在预埋连接件的外端架设防护棚;S4、在施工桥梁湿接缝时,梁缝预留用于后续将拆除的防护棚材料运出的工作孔;S5、桥梁湿接缝整体施工完毕后,拆除防护棚。本发明在预制箱梁时预埋连接件,在预埋连接件上通过连接结构搭设防护棚,且防护棚拆除时,拆除的防护棚材料可由工作孔运出,便于拆除,不但减少在预制小箱梁桥施工过程中对铁路的影响,而且可确保施工安全、高效、便利。
Temporary protection method in highway prefabricated small box girder bridge overpass railway construction process
The invention discloses a temporary protection method in a highway prefabricated small box girder bridge over-crossing railway construction process, which comprises the following steps: S1, prefabricating a box girder, fixing an embedded connecting piece at a set position of the box girder when reinforcement arrangement is completed and concrete is not poured, and enabling the outer end of the embedded connecting piece to extend out of the box girder; s2, after prefabrication of the box girder is completed, the steel mold is dismantled; s3, after the box girder is hoisted in place, a protective shed is erected at the outer end of the embedded connecting piece; s4, when a bridge wet joint is constructed, a working hole used for subsequently transporting out the dismantled protective shed material is reserved in the bridge joint; and S5, after the whole construction of the wet joint of the bridge is completed, the protective shed is dismantled. The connecting pieces are pre-buried when the box girder is prefabricated, the protective shed is erected on the pre-buried connecting pieces through the connecting structures, when the protective shed is dismantled, the dismantled protective shed materials can be transported out through the working holes, dismantling is convenient, the influence on a railway in the construction process of the prefabricated small box girder bridge is reduced, and it can be guaranteed that construction is safe, efficient and convenient.
本发明公开了一种公路预制小箱梁桥上跨铁路施工过程临时防护方法,包括:S1、预制箱梁,在完成布筋且未浇筑混凝土时,将预埋连接件固定在箱梁的设定位置上,且预埋连接件的外端伸出箱梁;S2、待箱梁预制完成后,拆除钢模;S3、将箱梁吊装就位后,在预埋连接件的外端架设防护棚;S4、在施工桥梁湿接缝时,梁缝预留用于后续将拆除的防护棚材料运出的工作孔;S5、桥梁湿接缝整体施工完毕后,拆除防护棚。本发明在预制箱梁时预埋连接件,在预埋连接件上通过连接结构搭设防护棚,且防护棚拆除时,拆除的防护棚材料可由工作孔运出,便于拆除,不但减少在预制小箱梁桥施工过程中对铁路的影响,而且可确保施工安全、高效、便利。
Temporary protection method in highway prefabricated small box girder bridge overpass railway construction process
公路预制小箱梁桥上跨铁路施工过程临时防护方法
HE KE (author) / DU LEI (author) / XU DEZHI (author) / YIN CHENZHE (author) / HUANG QINTAO (author) / GU XIAOYU (author) / SHAO JIANAN (author) / GUAN KUAI (author) / TAN JULIANG (author) / CAO QING (author)
2023-08-29
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method for dismantling overpass bridge of overpass railway
European Patent Office | 2024
|Overpass expressway steel box girder bridge construction method
European Patent Office | 2020
|Temporary protection structure of overpass expressway bridge
European Patent Office | 2025
|European Patent Office | 2021
|