A platform for research: civil engineering, architecture and urbanism
Deepwater platform steel pipe pile positioning and guiding device
The invention provides a deepwater platform steel pipe pile positioning and guiding device which comprises a plurality of vertical piles, at least two fixed guide beams are connected to the upper ends of the vertical piles and arranged in parallel, a movable beam assembly is arranged on the fixed guide beams, a walking device connected with the movable beam assembly is arranged below the movable beam assembly, and the walking device is in sliding connection with the fixed guide beams. A steel pipe pile holding clamp capable of sliding in the length direction of the movable beam assembly is further arranged on one side of the movable beam assembly and used for positioning the steel pipe pile, the moving direction of the first movable beam is perpendicular to the moving direction of the steel pipe pile holding clamp, and the problem that the deepwater platform steel pipe pile guiding device is low in implementation efficiency is solved.
本申请提供一种深水平台钢管桩定位导向装置,包括多个立桩,多个立桩上端连接有固定导梁,固定导梁为至少两个,各固定导梁平行布置,固定导梁上设有移动梁组件,移动梁组件下方设有相连接的行走装置,行走装置与固定导梁滑动连接,移动梁组件一侧还设有可沿移动梁组件长度方向滑动的钢管桩抱夹,钢管桩抱夹用于定位钢管桩,第一移动梁的移动方向与钢管桩抱夹的移动方向垂直,解决了深水平台钢管桩导向装置实施效率低的问题。
Deepwater platform steel pipe pile positioning and guiding device
The invention provides a deepwater platform steel pipe pile positioning and guiding device which comprises a plurality of vertical piles, at least two fixed guide beams are connected to the upper ends of the vertical piles and arranged in parallel, a movable beam assembly is arranged on the fixed guide beams, a walking device connected with the movable beam assembly is arranged below the movable beam assembly, and the walking device is in sliding connection with the fixed guide beams. A steel pipe pile holding clamp capable of sliding in the length direction of the movable beam assembly is further arranged on one side of the movable beam assembly and used for positioning the steel pipe pile, the moving direction of the first movable beam is perpendicular to the moving direction of the steel pipe pile holding clamp, and the problem that the deepwater platform steel pipe pile guiding device is low in implementation efficiency is solved.
本申请提供一种深水平台钢管桩定位导向装置,包括多个立桩,多个立桩上端连接有固定导梁,固定导梁为至少两个,各固定导梁平行布置,固定导梁上设有移动梁组件,移动梁组件下方设有相连接的行走装置,行走装置与固定导梁滑动连接,移动梁组件一侧还设有可沿移动梁组件长度方向滑动的钢管桩抱夹,钢管桩抱夹用于定位钢管桩,第一移动梁的移动方向与钢管桩抱夹的移动方向垂直,解决了深水平台钢管桩导向装置实施效率低的问题。
Deepwater platform steel pipe pile positioning and guiding device
深水平台钢管桩定位导向装置
WU ZHU (author) / WANG CHAO (author) / TONG LIN (author) / CHEN CHENG (author) / XU CAN (author)
2023-08-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deepwater foundation steel sheet pile inserting and driving guiding and positioning device
European Patent Office | 2021
|Deepwater pile foundation positioning and guiding structure and construction method
European Patent Office | 2015
|Steel pipe pile positioning device installed on pile stabilizing platform
European Patent Office | 2021
|