A platform for research: civil engineering, architecture and urbanism
Construction method for advanced sealing of post-cast strip
The invention discloses a construction method for advanced sealing of a post-cast strip, and relates to the technical field of constructional engineering. The advanced sealing construction method for the post-cast strip comprises the following steps that A, through BIM technology simulation, construction is revealed, and key procedures are demonstrated, so that workers master the key points of procedure operation, and reworking is avoided; according to the construction method for advanced sealing of the post-cast strip, through advanced sealing construction of the post-cast strip, the large-area concrete post-cast strip advanced sealing construction technology is formed through quality control from key points of BIM technology deepening design, formwork cleaning construction, stainless steel plate welding construction, waterproof construction, expansion bolt construction, self-adaptive concrete pouring and the like; the construction method is easy and convenient to operate, safe and reliable, the problems that large-area basement roof post-cast strip construction lags, is poor in forming and prone to leakage, and the construction quality is difficult to control are solved, and therefore the engineering construction progress is accelerated, and the engineering cost is reduced.
本发明公开了一种后浇带超前封闭的施工方法,涉及建筑工程技术领域。该后浇带超前封闭施工方法,包括如下步骤:步骤A:通过BIM技术模拟,对施工进行交底,对关键工序进行演示,使工人掌握工序操作重点,避免返工。该后浇带超前封闭的施工方法,通过对后浇带超前封闭施工,分别从BIM技术深化设计、清理支模施工、不锈钢板焊接施工、防水施工、膨胀螺栓施工、自适应混凝土浇筑、等关键点对质量控制,形成大面积混凝土后浇带超前封闭施工技术,提供了一种操作简便、安全可靠的施工方法,解决大面积地库顶板后浇带施工的滞后性,成型较差易渗漏,施工质量难控制等诸多难题,从而加快工程施工进度,降低工程造价。
Construction method for advanced sealing of post-cast strip
The invention discloses a construction method for advanced sealing of a post-cast strip, and relates to the technical field of constructional engineering. The advanced sealing construction method for the post-cast strip comprises the following steps that A, through BIM technology simulation, construction is revealed, and key procedures are demonstrated, so that workers master the key points of procedure operation, and reworking is avoided; according to the construction method for advanced sealing of the post-cast strip, through advanced sealing construction of the post-cast strip, the large-area concrete post-cast strip advanced sealing construction technology is formed through quality control from key points of BIM technology deepening design, formwork cleaning construction, stainless steel plate welding construction, waterproof construction, expansion bolt construction, self-adaptive concrete pouring and the like; the construction method is easy and convenient to operate, safe and reliable, the problems that large-area basement roof post-cast strip construction lags, is poor in forming and prone to leakage, and the construction quality is difficult to control are solved, and therefore the engineering construction progress is accelerated, and the engineering cost is reduced.
本发明公开了一种后浇带超前封闭的施工方法,涉及建筑工程技术领域。该后浇带超前封闭施工方法,包括如下步骤:步骤A:通过BIM技术模拟,对施工进行交底,对关键工序进行演示,使工人掌握工序操作重点,避免返工。该后浇带超前封闭的施工方法,通过对后浇带超前封闭施工,分别从BIM技术深化设计、清理支模施工、不锈钢板焊接施工、防水施工、膨胀螺栓施工、自适应混凝土浇筑、等关键点对质量控制,形成大面积混凝土后浇带超前封闭施工技术,提供了一种操作简便、安全可靠的施工方法,解决大面积地库顶板后浇带施工的滞后性,成型较差易渗漏,施工质量难控制等诸多难题,从而加快工程施工进度,降低工程造价。
Construction method for advanced sealing of post-cast strip
一种后浇带超前封闭的施工方法
ZENG JUN (author) / WEI JUNCHUN (author)
2023-08-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Sedimentation post-cast strip sealing construction method
European Patent Office | 2023
|Advanced sealing construction method for vertical post-cast strip of basement
European Patent Office | 2023
|Top plate post-cast strip advanced sealing structure and construction method thereof
European Patent Office | 2022
|Advanced sealing construction method for basement roof and wall post-cast strip
European Patent Office | 2024
|