A platform for research: civil engineering, architecture and urbanism
High formwork construction method
The invention discloses a high formwork erecting construction method, and relates to the technical field of building construction.A structure used in the method comprises a frame beam, a structural plate is arranged at the top of the frame beam, frame columns are arranged on the periphery of the frame beam, an embedded part is arranged in the middle of the frame beam, I-shaped steel is welded to the top of the embedded part, and the I-shaped steel is welded to the bottom of the frame beam. Positioning steel bars are welded to the tops of the I-beams, jacking supports are fixedly connected to the bottoms of the I-beams, round steel pipes are fixedly installed at the bottoms of the jacking supports, and the embedded parts and the I-beams play a role in dividing the frame beam into two parts, so that an inner frame system of the frame beam forms a two-layer segmented stress system. The embedded parts, the I-shaped steel and the like are additionally arranged in the middle frame beam, so that the whole inner frame system forms a two-layer segmented stress system, the occurrence of sub-part item projects exceeding a certain scale and with large dangerousness is avoided, the proposal expert argumentation time is shortened, and the construction preparation time is greatly shortened.
本发明公开了一种高支模施工方法,涉及建筑施工的技术领域,该方法使用的结构包括框架梁,所述框架梁的顶部设置有结构板,所述框架梁的四周设有框架柱,所述框架梁的中间设有预埋件,所述预埋件的顶部焊接有工字钢,所述工字钢的顶部焊接有定位钢筋,所述工字钢的底部固定连接有顶托,所述顶托的底部固定安装有圆钢管,所述预埋件与工字钢起到将框架梁一分为二的作用,使框架梁的内架体系形成二层分段的受力体系,本发明通过在中间框架梁中增设预埋件、工字钢等,使整个内架体系形成二层分段受力体系,规避了超过一定规模危险性较大分部分项工程的出现,减少了方案专家论证时间,施工准备时间将大大减小。
High formwork construction method
The invention discloses a high formwork erecting construction method, and relates to the technical field of building construction.A structure used in the method comprises a frame beam, a structural plate is arranged at the top of the frame beam, frame columns are arranged on the periphery of the frame beam, an embedded part is arranged in the middle of the frame beam, I-shaped steel is welded to the top of the embedded part, and the I-shaped steel is welded to the bottom of the frame beam. Positioning steel bars are welded to the tops of the I-beams, jacking supports are fixedly connected to the bottoms of the I-beams, round steel pipes are fixedly installed at the bottoms of the jacking supports, and the embedded parts and the I-beams play a role in dividing the frame beam into two parts, so that an inner frame system of the frame beam forms a two-layer segmented stress system. The embedded parts, the I-shaped steel and the like are additionally arranged in the middle frame beam, so that the whole inner frame system forms a two-layer segmented stress system, the occurrence of sub-part item projects exceeding a certain scale and with large dangerousness is avoided, the proposal expert argumentation time is shortened, and the construction preparation time is greatly shortened.
本发明公开了一种高支模施工方法,涉及建筑施工的技术领域,该方法使用的结构包括框架梁,所述框架梁的顶部设置有结构板,所述框架梁的四周设有框架柱,所述框架梁的中间设有预埋件,所述预埋件的顶部焊接有工字钢,所述工字钢的顶部焊接有定位钢筋,所述工字钢的底部固定连接有顶托,所述顶托的底部固定安装有圆钢管,所述预埋件与工字钢起到将框架梁一分为二的作用,使框架梁的内架体系形成二层分段的受力体系,本发明通过在中间框架梁中增设预埋件、工字钢等,使整个内架体系形成二层分段受力体系,规避了超过一定规模危险性较大分部分项工程的出现,减少了方案专家论证时间,施工准备时间将大大减小。
High formwork construction method
一种高支模施工方法
LIU MOQUAN (author) / TAN FUSHENG (author) / ZHAO LINWEI (author) / WU FEI (author) / GAO JIANGJING (author) / ZHONG YAN (author) / ZENG YONGGUI (author)
2023-08-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork support of outrigger construction formwork, construction formwork and construction method
European Patent Office | 2024
|Construction method of super high-rise creeping formwork and aluminum formwork combined formwork
European Patent Office | 2023
|Haunching formwork, formwork frame and construction method of formwork frame
European Patent Office | 2023
|