A platform for research: civil engineering, architecture and urbanism
The invention relates to an indoor wall stone dry mounting fixing structure and a construction method, and belongs to the technical field of stone dry mounting, the indoor wall stone dry mounting fixing structure comprises a plate, two vertical beams and a cross beam are arranged on one side of the plate, the two vertical beams are fixedly arranged at the two ends of the cross beam respectively, and first fixing blocks are fixedly arranged on the side walls, facing the plate, of the vertical beams; first inserting grooves are formed in the back faces of the plates, first storage grooves are formed in the opposite side walls of the two first fixing blocks, first clamping blocks are slidably connected into the first storage grooves, first clamping grooves are formed in the inner walls, at the first inserting grooves, of the plates, second fixing blocks are fixedly arranged on the side walls, facing the plates, of the cross beams, and second inserting grooves are formed in the back faces of the plates; and a second storage groove is formed in the side wall of one side of the second fixing block, a second clamping block is slidably connected into the second storage groove, a second clamping groove is formed in the inner wall, at the second inserting groove, of the plate, linkage assemblies are arranged in the cross beams and the vertical beams, and the effect of improving the mounting efficiency is achieved.
本申请涉及一种室内墙面石材干装固定结构及施工方法,属于石材干装的技术领域,其包括板材,板材的一侧设置有两个竖梁和一个横梁,两个竖梁分别固设在横梁的两端,竖梁朝向板材的侧壁固设有第一固定块,板材的背面开设有第一插槽,两个第一固定块相对的侧壁均开设有第一收纳槽,第一收纳槽内滑动连接有第一卡块,板材在第一插槽处的内壁开设有第一卡槽,横梁朝向板材的侧壁固设有第二固定块,板材的背面开设有第二插槽,第二固定块一侧的侧壁开设有第二收纳槽,第二收纳槽内滑动连接有第二卡块,板材在第二插槽处的内壁开设有第二卡槽,横梁和竖梁内设置有联动组件,本申请具有提高安装效率的效果。
The invention relates to an indoor wall stone dry mounting fixing structure and a construction method, and belongs to the technical field of stone dry mounting, the indoor wall stone dry mounting fixing structure comprises a plate, two vertical beams and a cross beam are arranged on one side of the plate, the two vertical beams are fixedly arranged at the two ends of the cross beam respectively, and first fixing blocks are fixedly arranged on the side walls, facing the plate, of the vertical beams; first inserting grooves are formed in the back faces of the plates, first storage grooves are formed in the opposite side walls of the two first fixing blocks, first clamping blocks are slidably connected into the first storage grooves, first clamping grooves are formed in the inner walls, at the first inserting grooves, of the plates, second fixing blocks are fixedly arranged on the side walls, facing the plates, of the cross beams, and second inserting grooves are formed in the back faces of the plates; and a second storage groove is formed in the side wall of one side of the second fixing block, a second clamping block is slidably connected into the second storage groove, a second clamping groove is formed in the inner wall, at the second inserting groove, of the plate, linkage assemblies are arranged in the cross beams and the vertical beams, and the effect of improving the mounting efficiency is achieved.
本申请涉及一种室内墙面石材干装固定结构及施工方法,属于石材干装的技术领域,其包括板材,板材的一侧设置有两个竖梁和一个横梁,两个竖梁分别固设在横梁的两端,竖梁朝向板材的侧壁固设有第一固定块,板材的背面开设有第一插槽,两个第一固定块相对的侧壁均开设有第一收纳槽,第一收纳槽内滑动连接有第一卡块,板材在第一插槽处的内壁开设有第一卡槽,横梁朝向板材的侧壁固设有第二固定块,板材的背面开设有第二插槽,第二固定块一侧的侧壁开设有第二收纳槽,第二收纳槽内滑动连接有第二卡块,板材在第二插槽处的内壁开设有第二卡槽,横梁和竖梁内设置有联动组件,本申请具有提高安装效率的效果。
Indoor wall surface stone dry installation fixing structure and construction method
一种室内墙面石材干装固定结构及施工方法
2023-09-01
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Construction method and fixing structure of stone curtain wall
European Patent Office | 2024
|Wall surface sawtooth-shaped dry hanging stone installation structure and construction method
European Patent Office | 2023
|Installation method of indoor stone curtain wall provided with sliding rail
European Patent Office | 2023
|Dry hanging stone curtain wall installation and construction method
European Patent Office | 2020
|