A platform for research: civil engineering, architecture and urbanism
Construction method for main structural wall and enclosure structure of subway station
The invention provides a construction method for a main body structure wall and an enclosure structure of a subway station, which comprises the following steps of: finding out an uneven hollow part of the enclosure structure before the main body structure wall is poured, arranging a grouting channel between the hollow part of the enclosure structure and a main body structure steel template, and after the main body structure wall is poured and the subway station is built, carrying out grouting on the grouting channel. Uniform grouting is carried out through the grouting channel, the gap between the enclosure structure and the main body structure wall is filled, and leakage of the subway station structure is reduced. According to the construction method for the main body structure wall and the enclosure structure of the subway station, the gap is actively grouted through the pre-buried channel in the early stage, the gap between the enclosure structure and the main body structure wall can be filled, and the leakage condition of the subway station structure is effectively solved.
本发明提供了地铁站主体结构墙与围护结构施工方法,主体结构墙浇注之前找到围护结构不平整的坑洼处,在围护结构的坑洼处与主体结构钢模板之间设置注浆通道,在主体结构墙浇注完成后,地铁站建造完成后,通过所述注浆通道进行统一注浆,填充围护结构与主体结构墙之间的空隙,减少地铁站结构的渗漏。本发明地铁站主体结构墙与围护结构施工方法,通过前期预埋通道主动对空隙进行注浆,能够填充好围护结构与主体结构墙之间的空隙,有效解决地铁站结构的渗漏情况。
Construction method for main structural wall and enclosure structure of subway station
The invention provides a construction method for a main body structure wall and an enclosure structure of a subway station, which comprises the following steps of: finding out an uneven hollow part of the enclosure structure before the main body structure wall is poured, arranging a grouting channel between the hollow part of the enclosure structure and a main body structure steel template, and after the main body structure wall is poured and the subway station is built, carrying out grouting on the grouting channel. Uniform grouting is carried out through the grouting channel, the gap between the enclosure structure and the main body structure wall is filled, and leakage of the subway station structure is reduced. According to the construction method for the main body structure wall and the enclosure structure of the subway station, the gap is actively grouted through the pre-buried channel in the early stage, the gap between the enclosure structure and the main body structure wall can be filled, and the leakage condition of the subway station structure is effectively solved.
本发明提供了地铁站主体结构墙与围护结构施工方法,主体结构墙浇注之前找到围护结构不平整的坑洼处,在围护结构的坑洼处与主体结构钢模板之间设置注浆通道,在主体结构墙浇注完成后,地铁站建造完成后,通过所述注浆通道进行统一注浆,填充围护结构与主体结构墙之间的空隙,减少地铁站结构的渗漏。本发明地铁站主体结构墙与围护结构施工方法,通过前期预埋通道主动对空隙进行注浆,能够填充好围护结构与主体结构墙之间的空隙,有效解决地铁站结构的渗漏情况。
Construction method for main structural wall and enclosure structure of subway station
地铁站主体结构墙与围护结构施工方法
HUANG HAIHUA (author) / GUO XIAOBING (author) / DU JIANCHUN (author) / XU KUN (author) / LU YU (author) / ZHAO ZHONGZHUANG (author) / YANG QILI (author)
2023-09-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Subway station construction main body enclosure structure
European Patent Office | 2023
|Dismantling construction method for shared enclosure structure of subway station
European Patent Office | 2022
|Sound insulation enclosure structure for subway station closed construction
European Patent Office | 2020
|Construction equipment for subway station deep foundation pit enclosure structure
European Patent Office | 2022
|European Patent Office | 2022
|