A platform for research: civil engineering, architecture and urbanism
Prestress tensioning platform
The invention provides a prestress tensioning platform, and relates to the technical field of bridge construction. The telescopic part is arranged in the lifting part; the tensioning part is arranged in the telescopic part; the rib fixing part is arranged outside the tensioning part; the reinforcing bar fixing part is arranged outside the tensioning part, inserting connection is fixed through the locking frame, then the reinforcing bar fixing part is kept stable conveniently, the tightening block is rotated to control the reinforcing bar fixing block to conduct position adjustment, then the reinforcing bar is tightened while being inserted into the butt joint block, and then the reinforcing bar is locked conveniently; according to the pre-stress tensioning platform, multiple sets of reinforcing steel bars can be tightened through one-time tightening, and the problems that for an existing traditional pre-stress tensioning platform, when the reinforcing steel bars are fixed, the reinforcing steel bars need to be sleeved with tightening pieces in sequence, but when the tightening pieces are tightened during fixing, the tightening pieces need to be beaten in sequence, the fixing process of the reinforcing steel bars is complex, and the fixing efficiency is high are solved. And therefore, the problem of inconvenience in loading and unloading treatment is solved.
本发明提供了一种预应力张拉平台,涉及桥梁施工技术领域,包括:升降部;所述伸缩部设置在升降部的内部;所述张拉部设置在伸缩部的内部;所述固筋部设置在张拉部的外部;通过将固筋部设置在张拉部的外部,使其通过锁紧架对插接还进行固定,进而便于其保持稳定,而通过转动收紧块,使其控制固筋块进行位置调整,进而通过插接在对接块内的同时进行收紧,进而便于对钢筋进行锁紧,进而便于通过一次收紧即可对多组钢筋进行收紧,解决了就目前传统预应力张拉平台而言,其在对钢筋进行固定时,通过需要依次对钢筋套上收紧件,但在对收紧件进行固定时收紧时,其需要依次敲打,进而导致其固定过程较为复杂,使其不便于进行装、卸处理的问题。
Prestress tensioning platform
The invention provides a prestress tensioning platform, and relates to the technical field of bridge construction. The telescopic part is arranged in the lifting part; the tensioning part is arranged in the telescopic part; the rib fixing part is arranged outside the tensioning part; the reinforcing bar fixing part is arranged outside the tensioning part, inserting connection is fixed through the locking frame, then the reinforcing bar fixing part is kept stable conveniently, the tightening block is rotated to control the reinforcing bar fixing block to conduct position adjustment, then the reinforcing bar is tightened while being inserted into the butt joint block, and then the reinforcing bar is locked conveniently; according to the pre-stress tensioning platform, multiple sets of reinforcing steel bars can be tightened through one-time tightening, and the problems that for an existing traditional pre-stress tensioning platform, when the reinforcing steel bars are fixed, the reinforcing steel bars need to be sleeved with tightening pieces in sequence, but when the tightening pieces are tightened during fixing, the tightening pieces need to be beaten in sequence, the fixing process of the reinforcing steel bars is complex, and the fixing efficiency is high are solved. And therefore, the problem of inconvenience in loading and unloading treatment is solved.
本发明提供了一种预应力张拉平台,涉及桥梁施工技术领域,包括:升降部;所述伸缩部设置在升降部的内部;所述张拉部设置在伸缩部的内部;所述固筋部设置在张拉部的外部;通过将固筋部设置在张拉部的外部,使其通过锁紧架对插接还进行固定,进而便于其保持稳定,而通过转动收紧块,使其控制固筋块进行位置调整,进而通过插接在对接块内的同时进行收紧,进而便于对钢筋进行锁紧,进而便于通过一次收紧即可对多组钢筋进行收紧,解决了就目前传统预应力张拉平台而言,其在对钢筋进行固定时,通过需要依次对钢筋套上收紧件,但在对收紧件进行固定时收紧时,其需要依次敲打,进而导致其固定过程较为复杂,使其不便于进行装、卸处理的问题。
Prestress tensioning platform
一种预应力张拉平台
WU JIANHUA (author) / YANG CHENG (author) / YAN GANG (author) / PING ZHANHUI (author)
2023-09-08
Patent
Electronic Resource
Chinese
Prestress tensioning operation platform with protection facility
European Patent Office | 2022
|