Construction method for assembling gate-type pier capping beam segments
The invention discloses a construction method for assembling gate-type pier capping beam sections, which comprises the following steps of: 1) respectively prefabricating cast-in-place sections at the top of a pier column, and sequentially mounting supporting legs, two groups of primary trusses which are adjacent end to end and two hoisting cranes on the upper sides of the prefabricated cast-in-place sections, and 2) respectively fixing hanging cross beams on the gate-type pier capping beam sections, (3) a hoisting crane uses an inverted-T-shaped special lifting appliance to lift the gate-type pier capping beam sections through the hanging cross beams, so that the gate-type pier capping beam sections are hung below the main truss after being close to the prefabricated cast-in-place sections; the construction method comprises the following steps of (1) constructing a plurality of gate-type pier bent cap sections, (2) completing the construction of the gate-type pier bent cap sections, (3) completing the hoisting and hanging of the gate-type pier bent cap sections section by section, (4) completing the hoisting and hanging of the gate-type pier bent cap sections section by section, (5) completing the temporary prestress tensioning of the gate-type pier bent cap sections, (6) completing the construction of wet joints among the gate-type pier bent cap sections, and (7) completing the permanent prestress tensioning of steel strands of the assembled gate-type pier bent cap. According to the construction method, the problem of gate-type pier capping beam construction in a road section with a short construction window period is solved, the site construction time is shortened, the construction efficiency is obviously improved, and social benefits and economic benefits are remarkable.
本发明公开了一种门式墩盖梁节段拼装的施工方法,包括:1)在墩柱顶部分别预制现浇段,在预制现浇段上侧依次安装支腿、首尾相邻的2组主桁架和2台卷扬起重机,2)将吊挂横梁分别固定在门式墩盖梁节段上,3)卷扬起重机使用倒T形专用吊具通过吊挂横梁分别起吊门式墩盖梁节段,使其靠近预制现浇段后悬挂在主桁架下;4)逐节完成各门式墩盖梁节段的起吊与悬挂,5)完成数节门式墩盖梁节段的临时预应力张拉,6)完成门式墩盖梁节段之间的湿接缝施工,7)完成拼装后门式墩盖梁的钢绞线永久预应力张拉。本发明解决了在施工窗口期较短的路段进行门式墩盖梁施工的难题,缩短了现场施工时间,明显提高了施工效率,社会效益和经济效益显著。
Construction method for assembling gate-type pier capping beam segments
The invention discloses a construction method for assembling gate-type pier capping beam sections, which comprises the following steps of: 1) respectively prefabricating cast-in-place sections at the top of a pier column, and sequentially mounting supporting legs, two groups of primary trusses which are adjacent end to end and two hoisting cranes on the upper sides of the prefabricated cast-in-place sections, and 2) respectively fixing hanging cross beams on the gate-type pier capping beam sections, (3) a hoisting crane uses an inverted-T-shaped special lifting appliance to lift the gate-type pier capping beam sections through the hanging cross beams, so that the gate-type pier capping beam sections are hung below the main truss after being close to the prefabricated cast-in-place sections; the construction method comprises the following steps of (1) constructing a plurality of gate-type pier bent cap sections, (2) completing the construction of the gate-type pier bent cap sections, (3) completing the hoisting and hanging of the gate-type pier bent cap sections section by section, (4) completing the hoisting and hanging of the gate-type pier bent cap sections section by section, (5) completing the temporary prestress tensioning of the gate-type pier bent cap sections, (6) completing the construction of wet joints among the gate-type pier bent cap sections, and (7) completing the permanent prestress tensioning of steel strands of the assembled gate-type pier bent cap. According to the construction method, the problem of gate-type pier capping beam construction in a road section with a short construction window period is solved, the site construction time is shortened, the construction efficiency is obviously improved, and social benefits and economic benefits are remarkable.
本发明公开了一种门式墩盖梁节段拼装的施工方法,包括:1)在墩柱顶部分别预制现浇段,在预制现浇段上侧依次安装支腿、首尾相邻的2组主桁架和2台卷扬起重机,2)将吊挂横梁分别固定在门式墩盖梁节段上,3)卷扬起重机使用倒T形专用吊具通过吊挂横梁分别起吊门式墩盖梁节段,使其靠近预制现浇段后悬挂在主桁架下;4)逐节完成各门式墩盖梁节段的起吊与悬挂,5)完成数节门式墩盖梁节段的临时预应力张拉,6)完成门式墩盖梁节段之间的湿接缝施工,7)完成拼装后门式墩盖梁的钢绞线永久预应力张拉。本发明解决了在施工窗口期较短的路段进行门式墩盖梁施工的难题,缩短了现场施工时间,明显提高了施工效率,社会效益和经济效益显著。
Construction method for assembling gate-type pier capping beam segments
门式墩盖梁节段拼装的施工方法
CHEN LELE (author) / JIN YONG (author) / JING BINGQIANG (author) / ZHANG JINFEI (author) / CUI JIANGTAO (author) / ZHOU KAI (author) / ZHANG QI (author) / XIA YUANSONG (author)
2023-09-12
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of gate-type pier capping beam support
European Patent Office | 2022
|Construction method for gate-type pier capping beam crossing existing line
European Patent Office | 2024
|