A platform for research: civil engineering, architecture and urbanism
River-crossing pipe gallery construction method
The invention relates to the technical field of pipe gallery construction, in particular to a river-crossing pipe gallery construction method which comprises the following working procedures that the construction range of a paying-off pipe gallery foundation pit is measured; measuring the direction and the head end and the tail end of a pay-off water pipe, wherein the head end and the tail end of the water pipe are located on the two sides of the pipe gallery foundation pit; constructing a fixing device for fixing the head end or the tail end of the water pipe and a limiting device for fixing the middle part of the water pipe; building a pump station connected with the water conveying pipe; two retaining dams which are located on the two sides of the pipe gallery foundation pit and transversely penetrate through the river channel are constructed; and the pipe gallery foundation pit and the pipe gallery are constructed. The method has the effect of effectively shortening the construction period.
本申请涉及管廊施工的技术领域,尤其是涉及一种过河管廊施工方法,其包括以下工序:测量放线管廊基坑的施工范围;测量放线输水管走向以及输水管首端和尾端位置,输水管首端和尾端位于管廊基坑的两侧;施工用于固定输水管首端或尾端的固定装置,以及用于固定输水管中部的限位装置;建设与输水管相连的泵站;施工两道位于管廊基坑两侧且横穿河道的拦水坝;施工管廊基坑及管廊。本申请具有有效减少施工工期的效果。
River-crossing pipe gallery construction method
The invention relates to the technical field of pipe gallery construction, in particular to a river-crossing pipe gallery construction method which comprises the following working procedures that the construction range of a paying-off pipe gallery foundation pit is measured; measuring the direction and the head end and the tail end of a pay-off water pipe, wherein the head end and the tail end of the water pipe are located on the two sides of the pipe gallery foundation pit; constructing a fixing device for fixing the head end or the tail end of the water pipe and a limiting device for fixing the middle part of the water pipe; building a pump station connected with the water conveying pipe; two retaining dams which are located on the two sides of the pipe gallery foundation pit and transversely penetrate through the river channel are constructed; and the pipe gallery foundation pit and the pipe gallery are constructed. The method has the effect of effectively shortening the construction period.
本申请涉及管廊施工的技术领域,尤其是涉及一种过河管廊施工方法,其包括以下工序:测量放线管廊基坑的施工范围;测量放线输水管走向以及输水管首端和尾端位置,输水管首端和尾端位于管廊基坑的两侧;施工用于固定输水管首端或尾端的固定装置,以及用于固定输水管中部的限位装置;建设与输水管相连的泵站;施工两道位于管廊基坑两侧且横穿河道的拦水坝;施工管廊基坑及管廊。本申请具有有效减少施工工期的效果。
River-crossing pipe gallery construction method
一种过河管廊施工方法
CHI YANZHI (author) / MA QI (author) / HOU HANGBING (author) / MA FUSHAN (author) / ARON (author) / QU YUNSHENG (author) / FAN CHONGJING (author) / CHENG ZEJUN (author)
2023-09-12
Patent
Electronic Resource
Chinese
River-crossing bowl-shaped pipe gallery structure and construction method thereof
European Patent Office | 2020
|European Patent Office | 2020
|European Patent Office | 2024
|