A platform for research: civil engineering, architecture and urbanism
Flood drainage pump station and construction method thereof
The invention relates to a flood drainage pump station and a construction method thereof, and belongs to the technical field of water conservancy projects. The pump room comprises a pump room body and a drainage pump, a partition layer plate is vertically arranged in the pump room body, the partition layer plate divides the space in the pump room body into a pump chamber and a water chamber, the pump chamber and the water chamber are communicated at the top of the space in the pump room body, and the drainage pump is arranged at the bottom of the pump chamber. A water inlet pipe of the drainage pump penetrates through the partition layer plate in a sealed mode and is located at the bottom of the water chamber, a water outlet pipe of the drainage pump penetrates through the pump room in a sealed mode, a water inlet notch communicated with the water chamber and the outside is formed in the bottom of the pump room, the water inlet notch is located underground, and the water inlet notch is filled with a gravel layer formed by gravel. The pump room is further provided with a pressure stabilizing opening communicated with the water chamber and the outside, and the height of the pressure stabilizing opening is lower than the top of the partition layer plate. The method has the effect of directly draining the located land.
本申请涉及一种排涝泵站及其施工方法,属于水利工程技术领域。其包括泵房和排水泵,所述泵房内竖向设置有分隔层板,所述分隔层板分所述泵房内空间为泵室和水室两部分,所述泵室和所述水室于所述泵房内空间的顶部连通,所述排水泵设置于所述泵室的底部,所述排水泵的进水管密封穿过所述分隔层板位于所述水室的底部,所述排水泵的出水管密封穿过所述泵房,所述泵房的底部开设有连通所述水室和外部的进水缺口,所述进水缺口位于地面下,所述进水缺口内填充有碎石形成的碎石层,所述泵房上还开设有连通所述水室和外部的稳压口,所述稳压口的高度低于所述分隔层板的顶部。本申请具有直接对所处地进行排涝的效果。
Flood drainage pump station and construction method thereof
The invention relates to a flood drainage pump station and a construction method thereof, and belongs to the technical field of water conservancy projects. The pump room comprises a pump room body and a drainage pump, a partition layer plate is vertically arranged in the pump room body, the partition layer plate divides the space in the pump room body into a pump chamber and a water chamber, the pump chamber and the water chamber are communicated at the top of the space in the pump room body, and the drainage pump is arranged at the bottom of the pump chamber. A water inlet pipe of the drainage pump penetrates through the partition layer plate in a sealed mode and is located at the bottom of the water chamber, a water outlet pipe of the drainage pump penetrates through the pump room in a sealed mode, a water inlet notch communicated with the water chamber and the outside is formed in the bottom of the pump room, the water inlet notch is located underground, and the water inlet notch is filled with a gravel layer formed by gravel. The pump room is further provided with a pressure stabilizing opening communicated with the water chamber and the outside, and the height of the pressure stabilizing opening is lower than the top of the partition layer plate. The method has the effect of directly draining the located land.
本申请涉及一种排涝泵站及其施工方法,属于水利工程技术领域。其包括泵房和排水泵,所述泵房内竖向设置有分隔层板,所述分隔层板分所述泵房内空间为泵室和水室两部分,所述泵室和所述水室于所述泵房内空间的顶部连通,所述排水泵设置于所述泵室的底部,所述排水泵的进水管密封穿过所述分隔层板位于所述水室的底部,所述排水泵的出水管密封穿过所述泵房,所述泵房的底部开设有连通所述水室和外部的进水缺口,所述进水缺口位于地面下,所述进水缺口内填充有碎石形成的碎石层,所述泵房上还开设有连通所述水室和外部的稳压口,所述稳压口的高度低于所述分隔层板的顶部。本申请具有直接对所处地进行排涝的效果。
Flood drainage pump station and construction method thereof
一种排涝泵站及其施工方法
BAO NINGYU (author) / SHI JUN (author) / JIN JIANPING (author) / DONG YINLEI (author) / LAO XIGANG (author) / CHEN PENGXIANG (author) / ZHENG HAO (author) / DING JINTAO (author) / HU YANYAN (author) / SU DANJUN (author)
2023-09-12
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Flood drainage pump station and construction method thereof
European Patent Office | 2022
|European Patent Office | 2022
|