A platform for research: civil engineering, architecture and urbanism
The invention discloses a building foundation piling construction auxiliary device, and relates to the technical field of building piling, the building foundation piling construction auxiliary device comprises a base, a support frame, a driving mechanism, a precast pile auxiliary limiting and clamping mechanism, a stabilizing mechanism and a cleaning mechanism; the precast pile auxiliary limiting and clamping mechanism is used for clamping and limiting a precast pile before piling; the stabilizing mechanism is used for downwards extending into the ground before piling to keep the stability of the base during piling; and the cleaning mechanism is used for cleaning soil on the surface of the stabilizing mechanism in the process that the stabilizing mechanism is upwards separated from the ground after piling. The precast pile auxiliary limiting and clamping mechanism, the stabilizing mechanism and the cleaning mechanism can operate under the driving of the driving mechanism, and the precast pile is subjected to auxiliary positioning through the precast pile auxiliary limiting and clamping mechanism, so that the precast pile is not easy to deviate during piling; the stability of the building foundation piling construction auxiliary device during piling is improved through the stabilizing mechanism; and soil adhered to the surface of the stabilizing mechanism is removed through the cleaning mechanism.
本发明公开了一种建筑基础打桩施工辅助装置,涉及建筑打桩技术领域,包括:底座、支撑架、驱动机构、预制桩辅助限位夹持机构、稳固机构和清理机构;预制桩辅助限位夹持机构用于在打桩之前将预制桩夹持限位;稳固机构用于在打桩之前向下伸入地面,保持底座打桩时的稳固性;清理机构用于在打桩之后,稳固机构向上脱离地面的过程中,清理稳固机构表面的泥土。本发明预制桩辅助限位夹持机构、稳固机构和清理机构能够在驱动机构的驱动下运转,通过预制桩辅助限位夹持机构对预制桩进行辅助定位,使得预制桩在打桩时不易出现偏移;通过稳固机构提高该建筑基础打桩施工辅助装置打桩时的稳定性;通过清理机构将稳固机构表面粘附的泥土清除。
The invention discloses a building foundation piling construction auxiliary device, and relates to the technical field of building piling, the building foundation piling construction auxiliary device comprises a base, a support frame, a driving mechanism, a precast pile auxiliary limiting and clamping mechanism, a stabilizing mechanism and a cleaning mechanism; the precast pile auxiliary limiting and clamping mechanism is used for clamping and limiting a precast pile before piling; the stabilizing mechanism is used for downwards extending into the ground before piling to keep the stability of the base during piling; and the cleaning mechanism is used for cleaning soil on the surface of the stabilizing mechanism in the process that the stabilizing mechanism is upwards separated from the ground after piling. The precast pile auxiliary limiting and clamping mechanism, the stabilizing mechanism and the cleaning mechanism can operate under the driving of the driving mechanism, and the precast pile is subjected to auxiliary positioning through the precast pile auxiliary limiting and clamping mechanism, so that the precast pile is not easy to deviate during piling; the stability of the building foundation piling construction auxiliary device during piling is improved through the stabilizing mechanism; and soil adhered to the surface of the stabilizing mechanism is removed through the cleaning mechanism.
本发明公开了一种建筑基础打桩施工辅助装置,涉及建筑打桩技术领域,包括:底座、支撑架、驱动机构、预制桩辅助限位夹持机构、稳固机构和清理机构;预制桩辅助限位夹持机构用于在打桩之前将预制桩夹持限位;稳固机构用于在打桩之前向下伸入地面,保持底座打桩时的稳固性;清理机构用于在打桩之后,稳固机构向上脱离地面的过程中,清理稳固机构表面的泥土。本发明预制桩辅助限位夹持机构、稳固机构和清理机构能够在驱动机构的驱动下运转,通过预制桩辅助限位夹持机构对预制桩进行辅助定位,使得预制桩在打桩时不易出现偏移;通过稳固机构提高该建筑基础打桩施工辅助装置打桩时的稳定性;通过清理机构将稳固机构表面粘附的泥土清除。
Auxiliary device for piling construction of building foundation
一种建筑基础打桩施工辅助装置
2023-09-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen