A platform for research: civil engineering, architecture and urbanism
Plugging device and plugging method of through-wall hole for building
The invention provides a blocking device and a blocking method for a through-wall hole for a building. An outer side baffle of the blocking device blocks the outer side of the hole; the bottom plate is fixed on a wall body below the hole; the two T-shaped fixing pieces are fixed to the portions, on the two sides of the hole, of the wall body, and four clamping openings are formed between the two T-shaped fixing pieces and the wall body. During construction, firstly, the outer side baffle, the bottom plate and the two T-shaped fixing pieces are fixed to the corresponding positions of a wall body; the two clamping strips of the dustpan opening are inserted into the first bayonet and the fourth bayonet; concrete is poured into the dustpan opening, and the concrete flows into the opening; the vertical plate of the L-shaped baffle is inserted into the second bayonet and the third bayonet; and the dustpan opening is removed, and redundant devices are removed after the concrete in the opening is initially set. The dustpan opening can be dismantled before initial setting of concrete, so that the concrete in the dustpan opening can be easily cleaned, redundant concrete convex blocks do not need to be chiseled, and the dustpan opening can be quickly put into the next hole plugging construction.
本发明提供一种建筑用穿墙洞口的封堵装置及封堵方法,该封堵装置的外侧挡板将洞口外侧封堵住;底板固定在洞口下方的墙体上;两个“T”形固定件固定在洞口两侧的墙体上,两个“T”形固定件与墙体之间形成四个卡口。施工时,先将外侧挡板、底板和两个“T”形固定件固定在墙体相应位置上;再将簸箕口的两个卡条插入第一卡口和第四卡口内;再向簸箕口灌入混凝土,混凝土流入洞口内;再将“L”形挡板的竖板插入第二卡口和第三卡口内;卸掉簸箕口,待洞口内的混凝土初凝后拆除多余装置。本发明能够在混凝土初凝前将簸箕口拆除,这样簸箕口内的混凝土就很容易被清理掉,也不用錾除多余混凝土凸块了,并且簸箕口能很快投入下一个洞口封堵施工中。
Plugging device and plugging method of through-wall hole for building
The invention provides a blocking device and a blocking method for a through-wall hole for a building. An outer side baffle of the blocking device blocks the outer side of the hole; the bottom plate is fixed on a wall body below the hole; the two T-shaped fixing pieces are fixed to the portions, on the two sides of the hole, of the wall body, and four clamping openings are formed between the two T-shaped fixing pieces and the wall body. During construction, firstly, the outer side baffle, the bottom plate and the two T-shaped fixing pieces are fixed to the corresponding positions of a wall body; the two clamping strips of the dustpan opening are inserted into the first bayonet and the fourth bayonet; concrete is poured into the dustpan opening, and the concrete flows into the opening; the vertical plate of the L-shaped baffle is inserted into the second bayonet and the third bayonet; and the dustpan opening is removed, and redundant devices are removed after the concrete in the opening is initially set. The dustpan opening can be dismantled before initial setting of concrete, so that the concrete in the dustpan opening can be easily cleaned, redundant concrete convex blocks do not need to be chiseled, and the dustpan opening can be quickly put into the next hole plugging construction.
本发明提供一种建筑用穿墙洞口的封堵装置及封堵方法,该封堵装置的外侧挡板将洞口外侧封堵住;底板固定在洞口下方的墙体上;两个“T”形固定件固定在洞口两侧的墙体上,两个“T”形固定件与墙体之间形成四个卡口。施工时,先将外侧挡板、底板和两个“T”形固定件固定在墙体相应位置上;再将簸箕口的两个卡条插入第一卡口和第四卡口内;再向簸箕口灌入混凝土,混凝土流入洞口内;再将“L”形挡板的竖板插入第二卡口和第三卡口内;卸掉簸箕口,待洞口内的混凝土初凝后拆除多余装置。本发明能够在混凝土初凝前将簸箕口拆除,这样簸箕口内的混凝土就很容易被清理掉,也不用錾除多余混凝土凸块了,并且簸箕口能很快投入下一个洞口封堵施工中。
Plugging device and plugging method of through-wall hole for building
建筑用穿墙洞口的封堵装置及封堵方法
SUN HAIYONG (author) / ZHENG HONGWEI (author) / CHEN CHAO (author) / WANG YI (author) / YAO XUEMIN (author) / YUE GUOQING (author) / XU JINPENG (author) / CHANG XINGXING (author) / LIU WEI (author) / GAO XIAOWEN (author)
2023-09-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fabricated building outer wall hole plugging device and plugging method
European Patent Office | 2024
|Building side wall structure hole plugging assembly and plugging method
European Patent Office | 2022
|