Foundation treatment method for reclamation stratum
The invention discloses a foundation treatment method for a reclamation stratum. The foundation treatment method comprises the steps that a to-be-treated area is determined; a shallow groove is excavated in the to-be-treated area; the groove wall of the shallow groove extends in the vertical direction. A mobile production platform located on the sea is built, and the mobile production platform communicates with the shallow groove through a pipeline; milling the groove downwards along the groove wall of the shallow groove to form a deep groove and generate geologic body particles; cement paste is prepared through the movable production platform, and the cement paste is poured into the deep groove through the pipeline within the designed distance; and mixing the cement paste and the geologic body particles in the deep groove to form a reinforced wall body. When the reclamation stratum is reinforced, the total amount of spoil and spoil is small, and environment friendliness is achieved; in addition, preparation of the cement paste is completed on the mobile production platform arranged on the sea, the land occupation area of land construction is reduced, and therefore the problem that the construction site is limited during sea reclamation foundation treatment is solved.
本发明公开了一种用于填海地层的地基处理方法,包括:确定待处理区域;在所述待处理区域内开挖浅槽;所述浅槽的槽壁沿竖直方向延伸;搭建位于海上的移动生产平台,并利用管道将所述移动生产平台与所述浅槽连通;沿所述浅槽的槽壁,向下铣槽,形成深槽,并产生地质体颗粒;利用所述移动生产平台制备水泥浆,在设计距离内,通过所述管道将所述水泥浆灌注至所述深槽内;拌合所述深槽内的所述水泥浆和所述地质体颗粒,形成加固墙体。对填海地层进行加固处理的同时,弃土和弃浆总量小,对环境较为友好;此外,水泥浆的制备在设置于海上的移动生产平台上完成,减小了陆上施工占地面积,从而解决了填海地基处理时施工场地受限的问题。
Foundation treatment method for reclamation stratum
The invention discloses a foundation treatment method for a reclamation stratum. The foundation treatment method comprises the steps that a to-be-treated area is determined; a shallow groove is excavated in the to-be-treated area; the groove wall of the shallow groove extends in the vertical direction. A mobile production platform located on the sea is built, and the mobile production platform communicates with the shallow groove through a pipeline; milling the groove downwards along the groove wall of the shallow groove to form a deep groove and generate geologic body particles; cement paste is prepared through the movable production platform, and the cement paste is poured into the deep groove through the pipeline within the designed distance; and mixing the cement paste and the geologic body particles in the deep groove to form a reinforced wall body. When the reclamation stratum is reinforced, the total amount of spoil and spoil is small, and environment friendliness is achieved; in addition, preparation of the cement paste is completed on the mobile production platform arranged on the sea, the land occupation area of land construction is reduced, and therefore the problem that the construction site is limited during sea reclamation foundation treatment is solved.
本发明公开了一种用于填海地层的地基处理方法,包括:确定待处理区域;在所述待处理区域内开挖浅槽;所述浅槽的槽壁沿竖直方向延伸;搭建位于海上的移动生产平台,并利用管道将所述移动生产平台与所述浅槽连通;沿所述浅槽的槽壁,向下铣槽,形成深槽,并产生地质体颗粒;利用所述移动生产平台制备水泥浆,在设计距离内,通过所述管道将所述水泥浆灌注至所述深槽内;拌合所述深槽内的所述水泥浆和所述地质体颗粒,形成加固墙体。对填海地层进行加固处理的同时,弃土和弃浆总量小,对环境较为友好;此外,水泥浆的制备在设置于海上的移动生产平台上完成,减小了陆上施工占地面积,从而解决了填海地基处理时施工场地受限的问题。
Foundation treatment method for reclamation stratum
用于填海地层的地基处理方法
CHENG CHEN (author) / QU XIAOYANG (author) / WANG XINXIN (author) / YANG JINZE (author) / ZHANG WENJIE (author) / JIANG ZHENGANG (author) / LI DEWEI (author)
2023-09-19
Patent
Electronic Resource
Chinese
Super-thick coal ash stratum foundation treatment method
European Patent Office | 2023
|Composite drainage body and complex stratum vacuum preloading foundation treatment method
European Patent Office | 2024
|Building foundation treatment method for region with liquefied soil bearing stratum
European Patent Office | 2022
|Control method for foundation construction under soft stratum treatment-free condition
European Patent Office | 2023
|