A platform for research: civil engineering, architecture and urbanism
Device for leveling and splicing prefabricated pipe piles after deep hole guiding and construction method
The invention discloses a device for leveling and splicing prefabricated pipe piles after deep hole guiding and a construction method, and relates to the technical field of foundation construction. The device for leveling and splicing the prefabricated tubular pile after deep hole guiding comprises a primary leveling roadbed plate, primary leveling level bubbles are arranged on the primary leveling roadbed plate, and the device further comprises a pile head hoop plate, an M8 bolt pair and a leveling support. Fastening end plates are arranged on the two sides of the pile head hoop plate, four bolt holes matched with M8 bolt pairs are formed in each fastening end plate, and a sling anti-falling device is arranged on the side, away from the pile head hoop plate, of each fastening end plate. The leveling and pile splicing device for the prefabricated pipe pile after deep hole guiding and the construction method have the advantages of being safe, stable, light and easy to install, capable of achieving manual leveling to guarantee the levelness of the pile splicing face, capable of being continuously used in a turnover mode, simple in mechanism and easy to maintain.
本发明公开了一种深层引孔后预制管桩调平及接桩的装置及施工方法,涉及地基基础施工技术领域。该深层引孔后预制管桩调平及接桩的装置,包括初调平路基板,所述初调平路基板上设置有初调平水准气泡,所述该装置还包括桩头抱箍板、M8螺栓副、可调平支架;所述桩头抱箍板的两侧均设置有紧固端头板,所述紧固端头板上设置有四个与M8螺栓副配合设置的螺栓孔,所述紧固端头板远离桩头抱箍板的一侧设置有吊带防脱落装置。该深层引孔后预制管桩调平及接桩的装置及施工方法,具有安全稳定,安装轻便容易,可以人工调平保证接桩面水平,可以持续周转使用,机构简单容易维保。
Device for leveling and splicing prefabricated pipe piles after deep hole guiding and construction method
The invention discloses a device for leveling and splicing prefabricated pipe piles after deep hole guiding and a construction method, and relates to the technical field of foundation construction. The device for leveling and splicing the prefabricated tubular pile after deep hole guiding comprises a primary leveling roadbed plate, primary leveling level bubbles are arranged on the primary leveling roadbed plate, and the device further comprises a pile head hoop plate, an M8 bolt pair and a leveling support. Fastening end plates are arranged on the two sides of the pile head hoop plate, four bolt holes matched with M8 bolt pairs are formed in each fastening end plate, and a sling anti-falling device is arranged on the side, away from the pile head hoop plate, of each fastening end plate. The leveling and pile splicing device for the prefabricated pipe pile after deep hole guiding and the construction method have the advantages of being safe, stable, light and easy to install, capable of achieving manual leveling to guarantee the levelness of the pile splicing face, capable of being continuously used in a turnover mode, simple in mechanism and easy to maintain.
本发明公开了一种深层引孔后预制管桩调平及接桩的装置及施工方法,涉及地基基础施工技术领域。该深层引孔后预制管桩调平及接桩的装置,包括初调平路基板,所述初调平路基板上设置有初调平水准气泡,所述该装置还包括桩头抱箍板、M8螺栓副、可调平支架;所述桩头抱箍板的两侧均设置有紧固端头板,所述紧固端头板上设置有四个与M8螺栓副配合设置的螺栓孔,所述紧固端头板远离桩头抱箍板的一侧设置有吊带防脱落装置。该深层引孔后预制管桩调平及接桩的装置及施工方法,具有安全稳定,安装轻便容易,可以人工调平保证接桩面水平,可以持续周转使用,机构简单容易维保。
Device for leveling and splicing prefabricated pipe piles after deep hole guiding and construction method
一种深层引孔后预制管桩调平及接桩的装置及施工方法
WANG MENG (author) / FU ZHIYONG (author) / LIU JINBAO (author) / SU BEI (author) / TAO JIUMIN (author) / XU HUI (author) / LIN NAN (author)
2023-09-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Building prefabricated construction floor leveling device
European Patent Office | 2020
|Construction method for splicing type caisson structure based on prefabricated hollow piles
European Patent Office | 2015
|Guiding and splicing construction method for recyclable foundation grouting guide pipe
European Patent Office | 2024
|European Patent Office | 2024
|