Underpinning construction method for reserved crown beam of subway station
The invention discloses an underpinning construction method for retaining a top beam of a subway station, which comprises the following steps of: S1, determining the position of an underpinning pile at a fender post or an enclosure wall between a station main body and an affiliated ventilation pavilion structure, pre-embedding a latticed column in the fender post or the enclosure wall at the position, and pouring concrete, so that the underpinning pile is formed; bearing and supporting the top beam, the track beam and the gantry crane by the enclosure piles or the enclosure walls and the latticed columns; s2, when the auxiliary ventilation pavilion structure is constructed, part of enclosure piles or enclosure walls and concrete outside latticed columns are broken, the latticed columns internally provided with the concrete and the enclosure piles or enclosure walls at the tops and the bottoms of the latticed columns jointly form force transmission support, and meanwhile a top plate and a bottom plate between the station body and the auxiliary ventilation pavilion structure are constructed; and S3, after shield construction is finished, the latticed columns between the top plate and the bottom plate are cut, and connection of the top plate and the bottom plate is completed. According to the construction method, construction joints can be reduced, the water leakage risk is reduced, meanwhile, the auxiliary ventilation pavilion and the station main body shield are constructed synchronously, and the construction efficiency is improved.
本发明公开了一种地铁车站保留冠梁的托换施工方法,包括以下步骤:S1,在车站主体与附属风亭结构之间的围护桩或围护墙处确定托换桩的位置,通过在该位置处的围护桩或围护墙内预埋格构柱,并浇筑混凝土,使围护桩或围护墙与格构柱共同对冠梁、轨道梁以及龙门吊进行承载支撑;S2,对附属风亭结构施工时,破除部分围护桩或围护墙以及格构柱外部混凝土,使内部成型有混凝土的格构柱与格构柱顶部以及底部的围护桩或围护墙共同形成传力支撑,同时对车站主体与附属风亭结构之间的顶板、底板施工;S3,在盾构施工结束后,对顶板与底板之间的格构柱进行切割,完成顶板、底板的连接。本发明施工方法可减少施工缝,减少渗漏水风险,同时附属风亭与车站主体盾构施工同步,提高了施工效率。
Underpinning construction method for reserved crown beam of subway station
The invention discloses an underpinning construction method for retaining a top beam of a subway station, which comprises the following steps of: S1, determining the position of an underpinning pile at a fender post or an enclosure wall between a station main body and an affiliated ventilation pavilion structure, pre-embedding a latticed column in the fender post or the enclosure wall at the position, and pouring concrete, so that the underpinning pile is formed; bearing and supporting the top beam, the track beam and the gantry crane by the enclosure piles or the enclosure walls and the latticed columns; s2, when the auxiliary ventilation pavilion structure is constructed, part of enclosure piles or enclosure walls and concrete outside latticed columns are broken, the latticed columns internally provided with the concrete and the enclosure piles or enclosure walls at the tops and the bottoms of the latticed columns jointly form force transmission support, and meanwhile a top plate and a bottom plate between the station body and the auxiliary ventilation pavilion structure are constructed; and S3, after shield construction is finished, the latticed columns between the top plate and the bottom plate are cut, and connection of the top plate and the bottom plate is completed. According to the construction method, construction joints can be reduced, the water leakage risk is reduced, meanwhile, the auxiliary ventilation pavilion and the station main body shield are constructed synchronously, and the construction efficiency is improved.
本发明公开了一种地铁车站保留冠梁的托换施工方法,包括以下步骤:S1,在车站主体与附属风亭结构之间的围护桩或围护墙处确定托换桩的位置,通过在该位置处的围护桩或围护墙内预埋格构柱,并浇筑混凝土,使围护桩或围护墙与格构柱共同对冠梁、轨道梁以及龙门吊进行承载支撑;S2,对附属风亭结构施工时,破除部分围护桩或围护墙以及格构柱外部混凝土,使内部成型有混凝土的格构柱与格构柱顶部以及底部的围护桩或围护墙共同形成传力支撑,同时对车站主体与附属风亭结构之间的顶板、底板施工;S3,在盾构施工结束后,对顶板与底板之间的格构柱进行切割,完成顶板、底板的连接。本发明施工方法可减少施工缝,减少渗漏水风险,同时附属风亭与车站主体盾构施工同步,提高了施工效率。
Underpinning construction method for reserved crown beam of subway station
一种地铁车站保留冠梁的托换施工方法
GUAN SHANZHI (author) / TANG XIAOPENG (author) / QIU XUCHAO (author) / CHEN KAI (author) / XU KUN (author) / YIN ZHIQING (author) / ZHAO QIANGHU (author) / ZHU CHENG (author)
2023-09-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Subway station reserved underpass structure system and construction method thereof
European Patent Office | 2021
|European Patent Office | 2024
|Underpinning trinity vestry building for subway construction
Engineering Index Backfile | 1916
Underpinning Trinity Vestry building for subway construction
Engineering Index Backfile | 1916
|