Building foundation slab jacking grouting settlement control system and implementation method thereof
A building foundation slab jacking grouting settlement control system and an implementation method thereof are characterized in that the settlement control system comprises a building foundation slab, an automatic settlement real-time monitoring system, a jacking system and a grouting filling system; wherein the automatic settlement real-time monitoring system is used for monitoring the settlement amount of a building foundation slab in real time and transmitting related information to the jacking system; the jacking system is linked with the automatic settlement real-time monitoring system to realize controllable jacking of the foundation slab, and a jacking target is a designed elevation before settlement or a preset target elevation; the grouting and filling system is used for filling and grouting in a gap below the bottom plate after the building foundation bottom plate is jacked; after the automatic settlement real-time monitoring system monitors settlement in real time, the jacking system is used for jacking a building foundation bottom plate, then the grouting filling system is used for grouting a gap space formed by the bottom of a building foundation and a soil body, and automatic settlement control and reinforcement of a building are completed.
一种建筑基础底板顶升注浆沉降控制系统及其实施方法,其特征在于,所述沉降控制系统包括建筑基础底板、自动化沉降实时监测系统、顶升系统和注浆填充系统;其中自动化沉降实时监测系统用于实时监测建筑基础底板的沉降量,并将相关信息传递给顶升系统;顶升系统通过与自动化沉降实时监测系统的联动,实现基础底板的可控顶升,顶升目标为沉降发生前的设计标高或提前设置的目标标高;注浆填充系统用于建筑基础底板被顶升后底板下空隙处的填充注浆;在所述自动化沉降实时监测系统实时监测到沉降后,利用顶升系统对建筑基础底板进行顶托,随后利用注浆填充系统对建筑物基础底部与土体形成的缝隙空间进行注浆,完成建筑物的自动化沉降控制和加固。
Building foundation slab jacking grouting settlement control system and implementation method thereof
A building foundation slab jacking grouting settlement control system and an implementation method thereof are characterized in that the settlement control system comprises a building foundation slab, an automatic settlement real-time monitoring system, a jacking system and a grouting filling system; wherein the automatic settlement real-time monitoring system is used for monitoring the settlement amount of a building foundation slab in real time and transmitting related information to the jacking system; the jacking system is linked with the automatic settlement real-time monitoring system to realize controllable jacking of the foundation slab, and a jacking target is a designed elevation before settlement or a preset target elevation; the grouting and filling system is used for filling and grouting in a gap below the bottom plate after the building foundation bottom plate is jacked; after the automatic settlement real-time monitoring system monitors settlement in real time, the jacking system is used for jacking a building foundation bottom plate, then the grouting filling system is used for grouting a gap space formed by the bottom of a building foundation and a soil body, and automatic settlement control and reinforcement of a building are completed.
一种建筑基础底板顶升注浆沉降控制系统及其实施方法,其特征在于,所述沉降控制系统包括建筑基础底板、自动化沉降实时监测系统、顶升系统和注浆填充系统;其中自动化沉降实时监测系统用于实时监测建筑基础底板的沉降量,并将相关信息传递给顶升系统;顶升系统通过与自动化沉降实时监测系统的联动,实现基础底板的可控顶升,顶升目标为沉降发生前的设计标高或提前设置的目标标高;注浆填充系统用于建筑基础底板被顶升后底板下空隙处的填充注浆;在所述自动化沉降实时监测系统实时监测到沉降后,利用顶升系统对建筑基础底板进行顶托,随后利用注浆填充系统对建筑物基础底部与土体形成的缝隙空间进行注浆,完成建筑物的自动化沉降控制和加固。
Building foundation slab jacking grouting settlement control system and implementation method thereof
一种建筑基础底板顶升注浆沉降控制系统及其实施方法
LIU GUANGLEI (author) / KANG ZENGZHU (author) / CHENG YUN (author) / CHEN YONGXUE (author) / YANG BAOSEN (author)
2023-09-22
Patent
Electronic Resource
Chinese