A platform for research: civil engineering, architecture and urbanism
Wall waterproof tile and construction method
The invention relates to the technical field of building waterproofing, in particular to a wall waterproof tile which comprises a tile body, the tile body is formed by combining an upper tile body and a bottom outward-turning type extending body, clamping grooves are formed in the inner side of the tile body at equal intervals, the clamping grooves are T-shaped grooves, the opening ends of the clamping grooves are located on the side of the extending body, and the opening ends of the clamping grooves are connected with the extending body. Fixing holes are formed in the top of the tile main body at equal intervals; the construction method of the wall surface waterproof tile comprises the following specific steps that S1, a wall surface is pretreated, and the wall surface can be troweled through cement ash; the problems that an existing wall surface waterproof technology is high in construction requirement, long in period and high in cost; especially, a building with a high floor is high in early-stage construction cost, if leakage is found in the later stage, a waterproof layer corresponding to a leakage point needs to be constructed, large-area waterproof construction needs to be conducted around the corresponding point, and later-stage maintenance is troublesome.
本发明涉及建筑防水技术领域,尤其为一种墙面防水瓦片,包括瓦片,所述瓦片由上部瓦片主体和底部外翻式延伸体组合而成,所述瓦片主体的内侧等距开设有卡槽,所述卡槽为T型槽设计,且开口端位于延伸体侧,所述瓦片主体的顶部等距开设有固定孔;一种墙面防水瓦片的施工方法,包括具体步骤如下,S1、墙面预处理,利于水泥灰对墙面进行抹平。本发明以解决现有墙面防水技术施工要求高,周期长,成本也高;特别楼层比较高建筑不但前期施工成本高,后期若发现有渗漏,需要对渗漏点对应的防水层施工,往往需要对应点周围也进行较大面的防水施工,后期维护较为麻烦的问题。
Wall waterproof tile and construction method
The invention relates to the technical field of building waterproofing, in particular to a wall waterproof tile which comprises a tile body, the tile body is formed by combining an upper tile body and a bottom outward-turning type extending body, clamping grooves are formed in the inner side of the tile body at equal intervals, the clamping grooves are T-shaped grooves, the opening ends of the clamping grooves are located on the side of the extending body, and the opening ends of the clamping grooves are connected with the extending body. Fixing holes are formed in the top of the tile main body at equal intervals; the construction method of the wall surface waterproof tile comprises the following specific steps that S1, a wall surface is pretreated, and the wall surface can be troweled through cement ash; the problems that an existing wall surface waterproof technology is high in construction requirement, long in period and high in cost; especially, a building with a high floor is high in early-stage construction cost, if leakage is found in the later stage, a waterproof layer corresponding to a leakage point needs to be constructed, large-area waterproof construction needs to be conducted around the corresponding point, and later-stage maintenance is troublesome.
本发明涉及建筑防水技术领域,尤其为一种墙面防水瓦片,包括瓦片,所述瓦片由上部瓦片主体和底部外翻式延伸体组合而成,所述瓦片主体的内侧等距开设有卡槽,所述卡槽为T型槽设计,且开口端位于延伸体侧,所述瓦片主体的顶部等距开设有固定孔;一种墙面防水瓦片的施工方法,包括具体步骤如下,S1、墙面预处理,利于水泥灰对墙面进行抹平。本发明以解决现有墙面防水技术施工要求高,周期长,成本也高;特别楼层比较高建筑不但前期施工成本高,后期若发现有渗漏,需要对渗漏点对应的防水层施工,往往需要对应点周围也进行较大面的防水施工,后期维护较为麻烦的问题。
Wall waterproof tile and construction method
一种墙面防水瓦片及施工方法
ZHANG SHIDU (author) / ZHANG DECHUANG (author) / XU MINGWEI (author)
2023-09-22
Patent
Electronic Resource
Chinese
WATERPROOF STRUCTURE OF OUTER WALL TILE, AND WATERPROOF CONSTRUCTION METHOD OF OUTER WALL TILE
European Patent Office | 2023
|Construction method of indoor floor tile waterproof floor
European Patent Office | 2020
|