Movable steel truss trolley for tall and large concrete side wall and formwork erecting construction method
The invention relates to the technical field of vehicle bodies, in particular to a high and large concrete side wall movable steel truss trolley which comprises a vehicle body, a support is arranged on the vehicle body and comprises a vertical frame and a transverse frame, the two ends of the transverse frame extend out of the vehicle body and are provided with formworks in pairs, a lifting roller is arranged at the end of the transverse frame, a lifting rope is arranged on the lifting roller, and one end of the lifting rope is connected with the lifting roller; a lifting hole is formed in the end portion of the transverse frame, the lifting rope penetrates through the lifting hole to be connected with the formwork, the formwork is connected with a connecting pipe in a sliding mode, and the connecting pipe is right opposite to the lifting hole. The lifting roller rotates to transport the formwork through the lifting rope, at the moment, the formwork is connected with the transverse frame through the lifting rope, the operation is relatively flexible, and an operator can finely adjust the position of the formwork and place the formwork at the accurate position. Afterwards, an operator pushes the connecting pipe, the connecting pipe slides upwards, the upper end of the connecting pipe is inserted into the lifting hole, at the moment, the formwork is rigidly connected with the transverse frame through the connecting pipe, and the formwork is not prone to shaking.
本申请涉及车体技术领域,尤其是高大混凝土边墙可移动式钢桁架台车,包括车体,车体上设有支架,支架包括竖架以及横架,横架的两端伸出车体并成对设有模板,横架的端部设有起吊辊,起吊辊上设有起吊绳,起吊绳一端与起吊辊相连,另一端与模板上端相连,横架的端部开设有起吊孔,起吊绳穿过起吊孔与模板相连,模板滑动连接有连接管,连接管与起吊孔正对。起吊辊转动通过起吊绳对模板进行运输,此时,模板通过起吊绳与横架相连,相对比较灵活,操作人员可以微调模板的位置,并将模板放置于准确位置。随后,操作人员推动连接管,连接管向上滑动,连接管的上端插入起吊孔内,此时模板通过连接管与横架刚性连接,模板不易晃动。
Movable steel truss trolley for tall and large concrete side wall and formwork erecting construction method
The invention relates to the technical field of vehicle bodies, in particular to a high and large concrete side wall movable steel truss trolley which comprises a vehicle body, a support is arranged on the vehicle body and comprises a vertical frame and a transverse frame, the two ends of the transverse frame extend out of the vehicle body and are provided with formworks in pairs, a lifting roller is arranged at the end of the transverse frame, a lifting rope is arranged on the lifting roller, and one end of the lifting rope is connected with the lifting roller; a lifting hole is formed in the end portion of the transverse frame, the lifting rope penetrates through the lifting hole to be connected with the formwork, the formwork is connected with a connecting pipe in a sliding mode, and the connecting pipe is right opposite to the lifting hole. The lifting roller rotates to transport the formwork through the lifting rope, at the moment, the formwork is connected with the transverse frame through the lifting rope, the operation is relatively flexible, and an operator can finely adjust the position of the formwork and place the formwork at the accurate position. Afterwards, an operator pushes the connecting pipe, the connecting pipe slides upwards, the upper end of the connecting pipe is inserted into the lifting hole, at the moment, the formwork is rigidly connected with the transverse frame through the connecting pipe, and the formwork is not prone to shaking.
本申请涉及车体技术领域,尤其是高大混凝土边墙可移动式钢桁架台车,包括车体,车体上设有支架,支架包括竖架以及横架,横架的两端伸出车体并成对设有模板,横架的端部设有起吊辊,起吊辊上设有起吊绳,起吊绳一端与起吊辊相连,另一端与模板上端相连,横架的端部开设有起吊孔,起吊绳穿过起吊孔与模板相连,模板滑动连接有连接管,连接管与起吊孔正对。起吊辊转动通过起吊绳对模板进行运输,此时,模板通过起吊绳与横架相连,相对比较灵活,操作人员可以微调模板的位置,并将模板放置于准确位置。随后,操作人员推动连接管,连接管向上滑动,连接管的上端插入起吊孔内,此时模板通过连接管与横架刚性连接,模板不易晃动。
Movable steel truss trolley for tall and large concrete side wall and formwork erecting construction method
高大混凝土边墙可移动式钢桁架台车及支模施工方法
DING SHOUWEN (author) / YANG WENZHONG (author) / DING ZHIJUN (author) / ZHAO FURONG (author) / GAO SHENG (author)
2023-09-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2022
|Movable formwork trolley for foundation pit side wall construction
European Patent Office | 2024
|Wall single-side formwork erecting device and formwork erecting method
European Patent Office | 2022
|Movable bridge concrete anti-collision wall formwork trolley and construction method
European Patent Office | 2023
|Formwork erecting and pouring construction method for light movable formwork of lock chamber wall
European Patent Office | 2023
|