A platform for research: civil engineering, architecture and urbanism
Electric power communication steel structure iron tower building construction method
The invention discloses an electric power communication steel structure iron tower building construction method, and relates to the technical field of steel structure communication iron tower construction. The adjusting piece corresponds to the clamping piece, and the clamping piece is connected with the adjusting piece through a lead screw; the hoisting piece is erected outside the lead screw and can hoist the preliminarily assembled steel structure; a pulling rope is wound in the hoisting piece, and the hoisting piece can be connected with the preliminarily assembled steel structure through the pulling rope. According to the construction method for the electric power communication steel structure iron tower, due to the fact that the clamping pieces are connected with the edges of the angle steel, the technical problems that in the implementation process of an existing electric power communication steel structure iron tower, a hoisting structure is tedious, and steel structure splicing is tedious are effectively solved, the purpose of connecting hoisting and the angle steel is achieved, and the construction efficiency is improved. And the convenience of assembling the steel structure is improved.
本发明公开了一种电力通信钢结构铁塔建造施工方法,涉及钢结构通信铁塔施工技术领域,该吊装包含:卡接件,可与铁塔上的角铁连接;调节件,与卡接件相互对应,且卡接件与调节件之间通过丝杆连接;以及起吊件,搭设在丝杆的外部,可对初步组装的钢结构进行起吊;所述起吊件的内部缠绕有牵引绳,且通过牵引绳可与初步组装的钢结构连接。本发明所述的一种电力通信钢结构铁塔建造施工方法,由于采用了卡接件与角钢的边缘连接,所以,有效解决了现有的电力通信钢结构铁塔在实施过程中,起吊结构繁琐,且钢结构拼接繁琐技术问题,进而实现了将吊装与角钢连接的目的,提高钢结构拼装的方便性。
Electric power communication steel structure iron tower building construction method
The invention discloses an electric power communication steel structure iron tower building construction method, and relates to the technical field of steel structure communication iron tower construction. The adjusting piece corresponds to the clamping piece, and the clamping piece is connected with the adjusting piece through a lead screw; the hoisting piece is erected outside the lead screw and can hoist the preliminarily assembled steel structure; a pulling rope is wound in the hoisting piece, and the hoisting piece can be connected with the preliminarily assembled steel structure through the pulling rope. According to the construction method for the electric power communication steel structure iron tower, due to the fact that the clamping pieces are connected with the edges of the angle steel, the technical problems that in the implementation process of an existing electric power communication steel structure iron tower, a hoisting structure is tedious, and steel structure splicing is tedious are effectively solved, the purpose of connecting hoisting and the angle steel is achieved, and the construction efficiency is improved. And the convenience of assembling the steel structure is improved.
本发明公开了一种电力通信钢结构铁塔建造施工方法,涉及钢结构通信铁塔施工技术领域,该吊装包含:卡接件,可与铁塔上的角铁连接;调节件,与卡接件相互对应,且卡接件与调节件之间通过丝杆连接;以及起吊件,搭设在丝杆的外部,可对初步组装的钢结构进行起吊;所述起吊件的内部缠绕有牵引绳,且通过牵引绳可与初步组装的钢结构连接。本发明所述的一种电力通信钢结构铁塔建造施工方法,由于采用了卡接件与角钢的边缘连接,所以,有效解决了现有的电力通信钢结构铁塔在实施过程中,起吊结构繁琐,且钢结构拼接繁琐技术问题,进而实现了将吊装与角钢连接的目的,提高钢结构拼装的方便性。
Electric power communication steel structure iron tower building construction method
一种电力通信钢结构铁塔建造施工方法
ZHOU HANGFEI (author) / GU JIAYU (author) / SHEN HAIHUA (author) / JIN HUIQIANG (author) / LI WEIZHONG (author) / TIAN JIAN (author) / LI QIANG (author) / SHAN JIA (author)
2023-09-22
Patent
Electronic Resource
Chinese
Electric power telecommunication steel structure iron tower building construction method
European Patent Office | 2020
|Communication iron tower building construction equipment and building construction method
European Patent Office | 2022
|Electric power communication steel tube tower mounting and fixing construction method
European Patent Office | 2020
|Communication iron tower building assembly type steel structure and mounting method thereof
European Patent Office | 2022
|