A platform for research: civil engineering, architecture and urbanism
The invention provides communication iron tower building construction equipment and a building construction method.The communication iron tower building construction equipment comprises a first support moving mechanism, a second support moving mechanism, a third support moving mechanism, a clamping mechanism and a guiding base. The process mode is high in operation difficulty and low in assembly efficiency, and the problems that movement and transformation of butt joint positions of assembly parts are difficult to flexibly adjust and lock, and hole site butt joint at the joints of the assembly parts cannot be flexibly adjusted are solved. And supports of corresponding models need to be replaced for the assembly operation of single-pipe towers of different models and sizes, the process is tedious and has limitation, and the assembly construction of the single-pipe towers cannot be effectively guaranteed.
本发明提供了一种通信铁塔建造施工设备及建造施工方法,包括移托机构一、移托机构二、移托机构三、夹定机构和导向底座,本发明解决了现今单管塔的组装连接过程都是通过人工方式进行对接组装,通过支架对组装部件进行支托,然后再进行连接锁紧组装成型,此过程方式操作难度大,组装效率低下,针对组装部件对接位置的移动变换难以灵活调整和锁定,不能灵活调整组装部件连接处的孔位对接,并且针对不同型号尺寸单管塔的组装作业需要更换相对应型号的支架,过程繁琐且具有局限性,不能有效的保证单管塔的组装施工等问题。
The invention provides communication iron tower building construction equipment and a building construction method.The communication iron tower building construction equipment comprises a first support moving mechanism, a second support moving mechanism, a third support moving mechanism, a clamping mechanism and a guiding base. The process mode is high in operation difficulty and low in assembly efficiency, and the problems that movement and transformation of butt joint positions of assembly parts are difficult to flexibly adjust and lock, and hole site butt joint at the joints of the assembly parts cannot be flexibly adjusted are solved. And supports of corresponding models need to be replaced for the assembly operation of single-pipe towers of different models and sizes, the process is tedious and has limitation, and the assembly construction of the single-pipe towers cannot be effectively guaranteed.
本发明提供了一种通信铁塔建造施工设备及建造施工方法,包括移托机构一、移托机构二、移托机构三、夹定机构和导向底座,本发明解决了现今单管塔的组装连接过程都是通过人工方式进行对接组装,通过支架对组装部件进行支托,然后再进行连接锁紧组装成型,此过程方式操作难度大,组装效率低下,针对组装部件对接位置的移动变换难以灵活调整和锁定,不能灵活调整组装部件连接处的孔位对接,并且针对不同型号尺寸单管塔的组装作业需要更换相对应型号的支架,过程繁琐且具有局限性,不能有效的保证单管塔的组装施工等问题。
Communication iron tower building construction equipment and building construction method
一种通信铁塔建造施工设备及建造施工方法
XU BO (author)
2022-04-12
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Electric power communication steel structure iron tower building construction method
European Patent Office | 2023
|Electric power telecommunication steel structure iron tower building construction method
European Patent Office | 2020
|Cooling tower building envelope, hyperbolic cooling tower and building envelope construction method
European Patent Office | 2024
|Intelligent tower building device for steel tower construction
European Patent Office | 2023
|