Anchor cable supporting structure and construction method thereof
The invention provides an anchor cable supporting structure and a construction method thereof, and relates to the technical field of engineering construction. The anchor cable supporting structure comprises a supporting pile, an anchor cable and a reinforcing layer, the supporting pile is located on the peripheral side of a foundation pit, the anchor cable comprises a free section and an anchoring section, the free section penetrates through the supporting pile and is fixed to the supporting pile, the anchoring section is fixed to a soil layer, and the peripheral side of the anchoring section is wrapped with the reinforcing layer. The supporting piles at the two ends of the anchor cable are fixed to the ground correspondingly, after the anchor cable is tensioned and locked, pulling force is applied to the supporting piles, and the supporting strength of the side wall of the foundation pit is enhanced. The engineering cost can be effectively reduced, the engineering cost is saved, and the construction period is shortened.
本申请提供一种锚索支护结构及其施工方法,涉及工程施工技术领域。锚索支护结构包括支护桩、锚索和加固层,所述支护桩位于基坑的周侧,所述锚索包括自由段和锚固段,所述自由段穿设所述支护桩并与所述支护桩固定,所述锚固段与土层固定,所述加固层包覆于所述锚固段的周侧。本申请通过将锚索的两端分别支护桩与地面固定,在锚索张拉锁紧后,对支护桩施加拉力,加强对基坑侧壁的支护强度。可有效降低工程成本,节约工程造价和缩短施工工期。
Anchor cable supporting structure and construction method thereof
The invention provides an anchor cable supporting structure and a construction method thereof, and relates to the technical field of engineering construction. The anchor cable supporting structure comprises a supporting pile, an anchor cable and a reinforcing layer, the supporting pile is located on the peripheral side of a foundation pit, the anchor cable comprises a free section and an anchoring section, the free section penetrates through the supporting pile and is fixed to the supporting pile, the anchoring section is fixed to a soil layer, and the peripheral side of the anchoring section is wrapped with the reinforcing layer. The supporting piles at the two ends of the anchor cable are fixed to the ground correspondingly, after the anchor cable is tensioned and locked, pulling force is applied to the supporting piles, and the supporting strength of the side wall of the foundation pit is enhanced. The engineering cost can be effectively reduced, the engineering cost is saved, and the construction period is shortened.
本申请提供一种锚索支护结构及其施工方法,涉及工程施工技术领域。锚索支护结构包括支护桩、锚索和加固层,所述支护桩位于基坑的周侧,所述锚索包括自由段和锚固段,所述自由段穿设所述支护桩并与所述支护桩固定,所述锚固段与土层固定,所述加固层包覆于所述锚固段的周侧。本申请通过将锚索的两端分别支护桩与地面固定,在锚索张拉锁紧后,对支护桩施加拉力,加强对基坑侧壁的支护强度。可有效降低工程成本,节约工程造价和缩短施工工期。
Anchor cable supporting structure and construction method thereof
锚索支护结构及其施工方法
LIU XIAOHONG (author) / WU CHENGYUN (author) / CHENG JIAN (author) / WANG ZHE (author) / XU XIAOLONG (author) / YANG KE (author) / LIN JINJUN (author) / ZHANG ZEYU (author) / WANG XINYUAN (author) / JIAO XIN (author)
2023-10-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Composite detachable anchor cable supporting structure and construction process thereof
European Patent Office | 2024
|European Patent Office | 2024
|Anchor cable supporting structure for foundation pit and construction method
European Patent Office | 2021
|Anchor cable structure and anchor cable frame beam construction method
European Patent Office | 2020
|