Construction method for reducing differential settlement of foundation edge platform
The invention provides a construction method for reducing differential settlement of a foundation near-edge platform, which is characterized in that grouting pipes are horizontally buried in a backfill soil body of a temporary platform, the grouting pipes are buried in the backfill soil body in a layered and spaced manner, and an auxiliary grouting mode is adopted in a backfill area to improve soil texture, coagulate into a whole and increase strength and compactness; the temporary platform is of a trapezoidal structure, stress is balanced, and sedimentation is stable and synchronous; a settlement value is reserved, balance is gradually counteracted in the process of continuously increasing the load, and finally stable settlement is achieved and the level is kept; multiple modes are integrated, differential settlement is greatly reduced, and the comprehensive effect is remarkable; the method is simple in construction and convenient to operate, and can be expanded to the field of deep foundation pit reinforcement.
本发明提供一种减少基础临边平台不均匀沉降的施工方法,临时平台回填土体内水平埋设有注浆管,注浆管在回填土体中分层、间隔埋设,回填区采取辅助注浆方式改善土质,凝结形成整体,增加强度和密实度;临时平台设置为梯形结构,受力均衡,沉降稳定同步;采取预留沉降量值,在不断增加荷载过程中逐步抵消平衡,最终实现沉降稳定、保持水平;多重方式集成,大大减小不均匀沉降,综合效果显著;本发明施工简单、操作方便,可拓展到深基坑加固领域。
Construction method for reducing differential settlement of foundation edge platform
The invention provides a construction method for reducing differential settlement of a foundation near-edge platform, which is characterized in that grouting pipes are horizontally buried in a backfill soil body of a temporary platform, the grouting pipes are buried in the backfill soil body in a layered and spaced manner, and an auxiliary grouting mode is adopted in a backfill area to improve soil texture, coagulate into a whole and increase strength and compactness; the temporary platform is of a trapezoidal structure, stress is balanced, and sedimentation is stable and synchronous; a settlement value is reserved, balance is gradually counteracted in the process of continuously increasing the load, and finally stable settlement is achieved and the level is kept; multiple modes are integrated, differential settlement is greatly reduced, and the comprehensive effect is remarkable; the method is simple in construction and convenient to operate, and can be expanded to the field of deep foundation pit reinforcement.
本发明提供一种减少基础临边平台不均匀沉降的施工方法,临时平台回填土体内水平埋设有注浆管,注浆管在回填土体中分层、间隔埋设,回填区采取辅助注浆方式改善土质,凝结形成整体,增加强度和密实度;临时平台设置为梯形结构,受力均衡,沉降稳定同步;采取预留沉降量值,在不断增加荷载过程中逐步抵消平衡,最终实现沉降稳定、保持水平;多重方式集成,大大减小不均匀沉降,综合效果显著;本发明施工简单、操作方便,可拓展到深基坑加固领域。
Construction method for reducing differential settlement of foundation edge platform
减少基础临边平台不均匀沉降的施工方法
WANG DAIFA (author) / ZHAO TIANQI (author) / ZHANG CHUNYONG (author) / QIN JUAN (author)
2023-10-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Construction engineering foundation settlement monitoring method
European Patent Office | 2020
|Novel foundation pit construction stable settlement method
European Patent Office | 2021
|Foundation anti-settlement structure and construction method
European Patent Office | 2020
|