A platform for research: civil engineering, architecture and urbanism
Construction device and construction method for fabricated bridge
The invention relates to a construction device and method for a fabricated bridge, and belongs to the technical field of bridge construction. The device comprises bridge piers and a main beam, a track section is arranged between the bridge piers and the main beam, the track section comprises a horizontal plate located between the main beam and the bridge piers and a vertical plate located on one side of the horizontal plate, notches are formed in the positions, opposite to the bridge piers at the two ends, of the horizontal plate, and movable plates are arranged on the positions, located at the notches, of the horizontal plate in a clamped mode; a sliding rail is arranged on the bridge pier and located on one side of the track section, a moving plate is arranged on the sliding rail in a sliding mode, a driving assembly used for driving the moving plate to move along the sliding rail is arranged on the moving plate, and a clamping plate is further arranged on the moving plate in a sliding mode. A moving assembly used for driving the clamping plate to be close to or away from the vertical plate is arranged on the moving plate, and a connecting piece used for being connected with the vertical plate is arranged on the clamping plate. The method has the effect of reducing the construction cost.
本申请涉及一种装配式桥梁用施工装置及施工方法,属于桥梁建设技术的领域。其包括桥墩与主梁,所述桥墩与主梁之间设置有轨道段,所述轨道段包括位于主梁与桥墩之间的水平板与位于水平板一侧的竖直板,所述水平板上与两端桥墩相对处开设有缺口,所述水平板上且位于缺口处卡接设置有活动板,所述桥墩上且位于轨道段的一侧设置有滑轨,所述滑轨上滑动设置有移动板,所述移动板上设置有用于驱动移动板沿滑轨进行移动的驱动组件,所述移动板上还滑动设置有夹取板,所述移动板上设置有用于驱动夹取板靠近或远离竖直板的移动组件,所述夹取板上设置有用于与竖直板相连接的连接件。本申请具有减少施工成本的效果。
Construction device and construction method for fabricated bridge
The invention relates to a construction device and method for a fabricated bridge, and belongs to the technical field of bridge construction. The device comprises bridge piers and a main beam, a track section is arranged between the bridge piers and the main beam, the track section comprises a horizontal plate located between the main beam and the bridge piers and a vertical plate located on one side of the horizontal plate, notches are formed in the positions, opposite to the bridge piers at the two ends, of the horizontal plate, and movable plates are arranged on the positions, located at the notches, of the horizontal plate in a clamped mode; a sliding rail is arranged on the bridge pier and located on one side of the track section, a moving plate is arranged on the sliding rail in a sliding mode, a driving assembly used for driving the moving plate to move along the sliding rail is arranged on the moving plate, and a clamping plate is further arranged on the moving plate in a sliding mode. A moving assembly used for driving the clamping plate to be close to or away from the vertical plate is arranged on the moving plate, and a connecting piece used for being connected with the vertical plate is arranged on the clamping plate. The method has the effect of reducing the construction cost.
本申请涉及一种装配式桥梁用施工装置及施工方法,属于桥梁建设技术的领域。其包括桥墩与主梁,所述桥墩与主梁之间设置有轨道段,所述轨道段包括位于主梁与桥墩之间的水平板与位于水平板一侧的竖直板,所述水平板上与两端桥墩相对处开设有缺口,所述水平板上且位于缺口处卡接设置有活动板,所述桥墩上且位于轨道段的一侧设置有滑轨,所述滑轨上滑动设置有移动板,所述移动板上设置有用于驱动移动板沿滑轨进行移动的驱动组件,所述移动板上还滑动设置有夹取板,所述移动板上设置有用于驱动夹取板靠近或远离竖直板的移动组件,所述夹取板上设置有用于与竖直板相连接的连接件。本申请具有减少施工成本的效果。
Construction device and construction method for fabricated bridge
一种装配式桥梁用施工装置及施工方法
WANG JUNZHANG (author) / XU YU (author) / DENG JIAWEI (author) / LIU WEI (author) / LIAO BO (author) / WANG WEI (author) / ZHAO SONGLIN (author) / ZHANG DEJIAN (author) / LI HONGCHAO (author) / ZHAO QI (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Fabricated highway steel bridge rapid construction device and construction method
European Patent Office | 2024
|