A platform for research: civil engineering, architecture and urbanism
Intercepting method for water conservancy construction
The invention provides a closure method for water conservancy construction, and belongs to the field of water conservancy projects, and the closure method for water conservancy construction specifically comprises the following steps: selecting a position; carrying out primary treatment on the closure position, cleaning the closure position, widening the two sides of the closure river channel, and reinforcing the widening position; the gate piers are installed, the prefabricated gate piers are hoisted, the prefabricated gate piers are placed at the reinforcing positions, and the positions of the gate piers are positioned and reinforced; and the gate plate is installed, a water liquid buffer pipe is installed on the gate, the gate is installed on the gate pier, and the buffer pipe on the gate is closed. According to the construction method, the prefabricated gate pier is installed by inserting the steel pipe on the prefabricated gate pier into the inner side of the closure position steel pipe, then the gate is inserted into the inner side of the gate pier, and water can be discharged through the buffer ring, so that the gate is conveniently installed, the construction time can be greatly saved, and the labor intensity can be reduced.
本发明提供一种水利施工用截流方法,属于水利工程领域,该水利施工用截流方法具体步骤为选取位置;对截流位置初步处理,对截流位置清理,对截流河道两侧进行加宽处理,对加宽位置加固处理;对闸墩进行安装,对预制闸墩进行吊装,将预制闸墩放置在加固位置,对闸墩位置进行定位加固;对闸板安装,在闸门上安装水液缓冲管,将闸门安装在闸墩上,对闸门上的缓冲管关闭。本发明利用预制闸墩上钢管插入到截流位置钢管的内侧,实现对预制闸墩的安装,然后利用闸门插入到闸墩的内侧并且通过缓冲环可对水液进行泄流,从而方便对闸门进行安装,本施工方法可大大节省施工时间,并且能够降低劳动强度。
Intercepting method for water conservancy construction
The invention provides a closure method for water conservancy construction, and belongs to the field of water conservancy projects, and the closure method for water conservancy construction specifically comprises the following steps: selecting a position; carrying out primary treatment on the closure position, cleaning the closure position, widening the two sides of the closure river channel, and reinforcing the widening position; the gate piers are installed, the prefabricated gate piers are hoisted, the prefabricated gate piers are placed at the reinforcing positions, and the positions of the gate piers are positioned and reinforced; and the gate plate is installed, a water liquid buffer pipe is installed on the gate, the gate is installed on the gate pier, and the buffer pipe on the gate is closed. According to the construction method, the prefabricated gate pier is installed by inserting the steel pipe on the prefabricated gate pier into the inner side of the closure position steel pipe, then the gate is inserted into the inner side of the gate pier, and water can be discharged through the buffer ring, so that the gate is conveniently installed, the construction time can be greatly saved, and the labor intensity can be reduced.
本发明提供一种水利施工用截流方法,属于水利工程领域,该水利施工用截流方法具体步骤为选取位置;对截流位置初步处理,对截流位置清理,对截流河道两侧进行加宽处理,对加宽位置加固处理;对闸墩进行安装,对预制闸墩进行吊装,将预制闸墩放置在加固位置,对闸墩位置进行定位加固;对闸板安装,在闸门上安装水液缓冲管,将闸门安装在闸墩上,对闸门上的缓冲管关闭。本发明利用预制闸墩上钢管插入到截流位置钢管的内侧,实现对预制闸墩的安装,然后利用闸门插入到闸墩的内侧并且通过缓冲环可对水液进行泄流,从而方便对闸门进行安装,本施工方法可大大节省施工时间,并且能够降低劳动强度。
Intercepting method for water conservancy construction
一种水利施工用截流方法
LI JIE (author) / ZHANG DONGDONG (author) / ZHAO XIN (author) / FAN SIDA (author) / XU WENTONG (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Algae intercepting device for water conservancy construction
European Patent Office | 2022
|Channel drainage intercepting device for water conservancy construction
European Patent Office | 2023
|Alga intercepting device for water conservancy water surface construction
European Patent Office | 2020
|Intercepting device for water conservancy project and using method of intercepting device
European Patent Office | 2024
|