A platform for research: civil engineering, architecture and urbanism
Pile foundation rapid forming equipment and construction process thereof
The pile foundation rapid forming equipment comprises a rack, a first lifting table and a second lifting table are slidably arranged on the rack in the vertical direction, the first lifting table is located below the second lifting table, a first lifting assembly used for driving the first lifting table to ascend and descend is arranged on the rack, and a second lifting assembly used for driving the second lifting table to ascend and descend is arranged on the rack. The second lifting assembly is used for driving the second lifting table to lift; a punching pile is rotatably arranged on the first lifting table, the punching pile is vertically arranged and penetrates through the first lifting table, the punching pile is hollow, the two ends of the punching pile are open, a drilling barrel is coaxially and fixedly arranged on the bottom wall of the punching pile, and a first driving assembly used for driving the punching pile to rotate is arranged on the first lifting table; a soil taking mechanism is arranged on the second lifting table and used for taking out soil in the punching pile. The device has the effect of improving the quality of the cast-in-place pile finished product.
本申请涉及一种桩基快速成型设备及其施工工艺,其包括机架,所述机架上沿竖直方向滑动设置有第一升降台和第二升降台,所述第一升降台位于第二升降台的下方,所述机架上设置有用于驱使第一升降台升降的第一升降组件,以及用于驱使第二升降台升降的第二升降组件;所述第一升降台上转动设置有打孔桩,所述打孔桩竖直设置且贯穿第一升降台,所述打孔桩中空且两端开口设置,所述打孔桩的底壁同轴固定设置有钻筒,所述第一升降台上设置有用于驱使打孔桩转动的第一驱动组件,所述第二升降台上设置有取土机构,所述取土机构用于将打孔桩内泥土取出。本申请具有提高灌注桩成品质量的效果。
Pile foundation rapid forming equipment and construction process thereof
The pile foundation rapid forming equipment comprises a rack, a first lifting table and a second lifting table are slidably arranged on the rack in the vertical direction, the first lifting table is located below the second lifting table, a first lifting assembly used for driving the first lifting table to ascend and descend is arranged on the rack, and a second lifting assembly used for driving the second lifting table to ascend and descend is arranged on the rack. The second lifting assembly is used for driving the second lifting table to lift; a punching pile is rotatably arranged on the first lifting table, the punching pile is vertically arranged and penetrates through the first lifting table, the punching pile is hollow, the two ends of the punching pile are open, a drilling barrel is coaxially and fixedly arranged on the bottom wall of the punching pile, and a first driving assembly used for driving the punching pile to rotate is arranged on the first lifting table; a soil taking mechanism is arranged on the second lifting table and used for taking out soil in the punching pile. The device has the effect of improving the quality of the cast-in-place pile finished product.
本申请涉及一种桩基快速成型设备及其施工工艺,其包括机架,所述机架上沿竖直方向滑动设置有第一升降台和第二升降台,所述第一升降台位于第二升降台的下方,所述机架上设置有用于驱使第一升降台升降的第一升降组件,以及用于驱使第二升降台升降的第二升降组件;所述第一升降台上转动设置有打孔桩,所述打孔桩竖直设置且贯穿第一升降台,所述打孔桩中空且两端开口设置,所述打孔桩的底壁同轴固定设置有钻筒,所述第一升降台上设置有用于驱使打孔桩转动的第一驱动组件,所述第二升降台上设置有取土机构,所述取土机构用于将打孔桩内泥土取出。本申请具有提高灌注桩成品质量的效果。
Pile foundation rapid forming equipment and construction process thereof
一种桩基快速成型设备及其施工工艺
XU YU (author) / LIU WEI (author) / GAO WEI (author) / WANG JUNZHANG (author) / DENG JIAWEI (author) / ZHANG DEJIAN (author) / LIAO BO (author) / WANG WEI (author) / ZHAO SONGLIN (author) / LI HONGCHAO (author)
2023-10-10
Patent
Electronic Resource
Chinese
Pile foundation equipment applied to complex foundation and pile forming construction method
European Patent Office | 2024
|Soft soil area foundation composite pile foundation and pile foundation construction process thereof
European Patent Office | 2021
|Foundation pile foundation hole forming construction method
European Patent Office | 2022
|European Patent Office | 2021
|Pile-forming construction device of composite foundation pile
European Patent Office | 2022
|