Building lifting corridor and using method thereof
The invention discloses an inter-building lifting corridor and a using method thereof, and relates to the technical field of building construction equipment, the inter-building lifting corridor comprises a long-edge corridor and a short-edge corridor, the short-edge corridor is of a plate-shaped structure, the long-edge corridor is of a truss structure, and derricks are arranged on the left side and the right side of the long-edge corridor correspondingly; a stand column fixed to a building body is arranged on the side, away from the long-edge corridor, of the derrick, and the derrick is fixedly connected with the stand column. The method has the beneficial effects that in the construction process, the corridor is spliced on the splicing jig frame at the projection position below the corridor, the danger coefficient is low, operation is convenient, and the installation efficiency is high; the stand columns and the inclined struts of the lifting frame are all directly connected with a building body in a concrete pre-buried mode, and by the adoption of the structure, site construction safety is guaranteed, meanwhile, engineering cost is reduced, and the construction period is shortened; before formal lifting, the corridors are lifted layer by layer and sequentially spliced from top to bottom, then formal lifting is carried out after testing is completed, generation of dangerous factors is effectively controlled, and the safety risk during construction is reduced.
本发明公开了一种楼间升降连廊及其使用方法,涉及建筑施工设备技术领域,包括长边连廊和短边连廊,所述短边连廊为板状结构,所述长边连廊为桁架结构,所述长边连廊左右两侧分别设置有井架,所述井架远离长边连廊一侧设置有固定在楼体上的立柱,所述井架与所述立柱固定连接;有益效果在于:本发明施工过程中连廊在其下方投影位置的拼装胎架上进行拼装,危险系数低,便于操作,安装效率高;立柱和提升架的斜撑均与楼体直接混凝土预埋方式连接,采用该结构不仅保证现场施工安全,同时降低了工程成本、缩短了施工周期;在正式提升前将连廊逐层提升从上向下依次拼装,然后完成测试后再进行正式提升,有效控制危险因素的产生,降低了施工时的安全风险。
Building lifting corridor and using method thereof
The invention discloses an inter-building lifting corridor and a using method thereof, and relates to the technical field of building construction equipment, the inter-building lifting corridor comprises a long-edge corridor and a short-edge corridor, the short-edge corridor is of a plate-shaped structure, the long-edge corridor is of a truss structure, and derricks are arranged on the left side and the right side of the long-edge corridor correspondingly; a stand column fixed to a building body is arranged on the side, away from the long-edge corridor, of the derrick, and the derrick is fixedly connected with the stand column. The method has the beneficial effects that in the construction process, the corridor is spliced on the splicing jig frame at the projection position below the corridor, the danger coefficient is low, operation is convenient, and the installation efficiency is high; the stand columns and the inclined struts of the lifting frame are all directly connected with a building body in a concrete pre-buried mode, and by the adoption of the structure, site construction safety is guaranteed, meanwhile, engineering cost is reduced, and the construction period is shortened; before formal lifting, the corridors are lifted layer by layer and sequentially spliced from top to bottom, then formal lifting is carried out after testing is completed, generation of dangerous factors is effectively controlled, and the safety risk during construction is reduced.
本发明公开了一种楼间升降连廊及其使用方法,涉及建筑施工设备技术领域,包括长边连廊和短边连廊,所述短边连廊为板状结构,所述长边连廊为桁架结构,所述长边连廊左右两侧分别设置有井架,所述井架远离长边连廊一侧设置有固定在楼体上的立柱,所述井架与所述立柱固定连接;有益效果在于:本发明施工过程中连廊在其下方投影位置的拼装胎架上进行拼装,危险系数低,便于操作,安装效率高;立柱和提升架的斜撑均与楼体直接混凝土预埋方式连接,采用该结构不仅保证现场施工安全,同时降低了工程成本、缩短了施工周期;在正式提升前将连廊逐层提升从上向下依次拼装,然后完成测试后再进行正式提升,有效控制危险因素的产生,降低了施工时的安全风险。
Building lifting corridor and using method thereof
一种楼间升降连廊及其使用方法
AN JIE (author) / LYU YANG (author) / XU WENJING (author) / LIANG KAI (author) / LI MINGYUAN (author) / WEI YAGUANG (author) / DENG MENG (author) / WANG SHENGFENG (author)
2023-10-10
Patent
Electronic Resource
Chinese
Steel corridor lifting installation method and lifting device
European Patent Office | 2022
|Corridor lifting and folding structure and construction method thereof
European Patent Office | 2022
|Fabricated building corridor and construction method thereof
European Patent Office | 2024
|