A platform for research: civil engineering, architecture and urbanism
Positioning and deviation rectifying device for secant pile construction
The invention relates to the technical field of secant pile construction, in particular to a secant pile construction positioning and deviation rectifying device which comprises a bearing mechanism, a driving mechanism and four centering mechanisms arranged in a cross shape, and the bearing mechanism comprises a main plate and a top plate fixed to the top end of the main plate. According to the device, the wire hanging frame and the wire winding seat are arranged at the top and the bottom of the shell, and a second electric push rod on the wire winding seat can release a pull rope wound around the second electric push rod when retracting, so that when the centering mechanism and a reinforcement cage appear in the process of pulling the driving mechanism and the centering mechanism to move upwards as a whole, the centering mechanism and the reinforcement cage can be pulled out; the two pull ropes are manually pulled to move correspondingly, the obliquely-arranged shell is pulled, the position of the centering mechanism connected with the reinforcement cage in a hooked mode is conveniently adjusted, and therefore the centering mechanism can be separated from the reinforcement cage, and overall hoisting and recycling are facilitated; therefore, the probability that the driving mechanism and the centering mechanism are inconvenient to take out due to blocking of the reinforcement cage can be reduced, and the positioning and deviation rectifying efficiency can be improved.
本发明涉及咬合桩施工技术领域,具体涉及一种咬合桩施工定位、纠偏装置,包括承载机构、驱动机构和四个呈十字型布置的定中机构,所述承载机构包括主板和固定于主板顶端的顶板。本发明中,通过在壳体的顶部和底部设置挂线架和绕线座,且绕线座上的第二电动推杆收缩时能够对绕过其的拉绳进行释放,这样能够拉动驱动机构和定中机构整体上移过程中出现定中机构与钢筋笼的情况时,通过人工拉动两个拉绳分别移动,拉动倾斜布置的壳体便于将与钢筋笼勾连的定中机构位置进行调整,从而使得定中机构能够与钢筋笼脱离,便于整体的起吊回收,从而能够降低因钢筋笼的阻挡导致驱动机构和定中机构不便于取出情况出现的几率,能够提高定位纠偏的效率。
Positioning and deviation rectifying device for secant pile construction
The invention relates to the technical field of secant pile construction, in particular to a secant pile construction positioning and deviation rectifying device which comprises a bearing mechanism, a driving mechanism and four centering mechanisms arranged in a cross shape, and the bearing mechanism comprises a main plate and a top plate fixed to the top end of the main plate. According to the device, the wire hanging frame and the wire winding seat are arranged at the top and the bottom of the shell, and a second electric push rod on the wire winding seat can release a pull rope wound around the second electric push rod when retracting, so that when the centering mechanism and a reinforcement cage appear in the process of pulling the driving mechanism and the centering mechanism to move upwards as a whole, the centering mechanism and the reinforcement cage can be pulled out; the two pull ropes are manually pulled to move correspondingly, the obliquely-arranged shell is pulled, the position of the centering mechanism connected with the reinforcement cage in a hooked mode is conveniently adjusted, and therefore the centering mechanism can be separated from the reinforcement cage, and overall hoisting and recycling are facilitated; therefore, the probability that the driving mechanism and the centering mechanism are inconvenient to take out due to blocking of the reinforcement cage can be reduced, and the positioning and deviation rectifying efficiency can be improved.
本发明涉及咬合桩施工技术领域,具体涉及一种咬合桩施工定位、纠偏装置,包括承载机构、驱动机构和四个呈十字型布置的定中机构,所述承载机构包括主板和固定于主板顶端的顶板。本发明中,通过在壳体的顶部和底部设置挂线架和绕线座,且绕线座上的第二电动推杆收缩时能够对绕过其的拉绳进行释放,这样能够拉动驱动机构和定中机构整体上移过程中出现定中机构与钢筋笼的情况时,通过人工拉动两个拉绳分别移动,拉动倾斜布置的壳体便于将与钢筋笼勾连的定中机构位置进行调整,从而使得定中机构能够与钢筋笼脱离,便于整体的起吊回收,从而能够降低因钢筋笼的阻挡导致驱动机构和定中机构不便于取出情况出现的几率,能够提高定位纠偏的效率。
Positioning and deviation rectifying device for secant pile construction
一种咬合桩施工定位、纠偏装置
LI PENGFEI (author) / ZHANG HUAN (author) / CHEN BIN (author) / HUANG QINGYONG (author) / XU CHANGGANG (author) / DU JIAN (author) / YUAN ZHEN (author) / WANG MENGHAN (author)
2023-10-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|European Patent Office | 2023
|Single-pile deviation rectifying device and construction method thereof
European Patent Office | 2022
|Reusable secant pile wall positioning device and construction method
European Patent Office | 2020
|