A platform for research: civil engineering, architecture and urbanism
Prefabricating and manufacturing process for agricultural greenhouse foundation wall module
The invention discloses an agricultural greenhouse foundation wall module prefabrication manufacturing process which comprises the steps that materials needed for manufacturing a wall and keels are arranged in a mold together, the opening direction of the mold is consistent with the opening direction of the keels, and the height of the mold is larger than that of the side walls of the keels; adding a waterproof agent, organic silicon and a foam stabilizer into the obtained cement mortar, mixing and stirring, then pouring into a mold with a keel material, and standing for a period of time; a foaming agent is poured into the cement mortar before standing, mixing is carried out, and the height after foaming is the same as the overall height of the keel. The greenhouse wall body modules are installed in a combined mode and can be used for different greenhouses, meanwhile, the assembled foundation wall body is high in overall firmness, the waterproof performance and the crack resistance are high, the overall firmness of the foundation wall body modules is high, the foundation wall body modules are not prone to inclining after being installed on the two sides of a greenhouse foundation, and the service life of the foundation wall body modules is prolonged. And the use process is firmer.
本发明公开了一种农业大棚基础墙体模块预制制作工艺,将制作墙体所需要的材料和龙骨一起布置于模具内,模具的开口与龙骨的开口方向一致,模具的高度高于龙骨的侧壁高度;将上述得到的水泥砂浆中加入防水剂、有机硅和稳泡剂,并混合搅拌,随后倒入有龙骨材料的模具中,静置一段时间;在上述的水泥砂浆静置前倒入发泡剂,并进行混合,发泡后的高度与龙骨的整体高度相同。本发明通过将大棚墙体模块造成组合式安装,能针对不同的大棚进行使用,同时组装后的基础墙体整体牢固性高,而且还具有较强的防水性能和抗裂性能,而且该基础墙体模块整体牢固性高,在大棚地基两侧安装后不易产生倾斜,使用过程中更加牢靠。
Prefabricating and manufacturing process for agricultural greenhouse foundation wall module
The invention discloses an agricultural greenhouse foundation wall module prefabrication manufacturing process which comprises the steps that materials needed for manufacturing a wall and keels are arranged in a mold together, the opening direction of the mold is consistent with the opening direction of the keels, and the height of the mold is larger than that of the side walls of the keels; adding a waterproof agent, organic silicon and a foam stabilizer into the obtained cement mortar, mixing and stirring, then pouring into a mold with a keel material, and standing for a period of time; a foaming agent is poured into the cement mortar before standing, mixing is carried out, and the height after foaming is the same as the overall height of the keel. The greenhouse wall body modules are installed in a combined mode and can be used for different greenhouses, meanwhile, the assembled foundation wall body is high in overall firmness, the waterproof performance and the crack resistance are high, the overall firmness of the foundation wall body modules is high, the foundation wall body modules are not prone to inclining after being installed on the two sides of a greenhouse foundation, and the service life of the foundation wall body modules is prolonged. And the use process is firmer.
本发明公开了一种农业大棚基础墙体模块预制制作工艺,将制作墙体所需要的材料和龙骨一起布置于模具内,模具的开口与龙骨的开口方向一致,模具的高度高于龙骨的侧壁高度;将上述得到的水泥砂浆中加入防水剂、有机硅和稳泡剂,并混合搅拌,随后倒入有龙骨材料的模具中,静置一段时间;在上述的水泥砂浆静置前倒入发泡剂,并进行混合,发泡后的高度与龙骨的整体高度相同。本发明通过将大棚墙体模块造成组合式安装,能针对不同的大棚进行使用,同时组装后的基础墙体整体牢固性高,而且还具有较强的防水性能和抗裂性能,而且该基础墙体模块整体牢固性高,在大棚地基两侧安装后不易产生倾斜,使用过程中更加牢靠。
Prefabricating and manufacturing process for agricultural greenhouse foundation wall module
一种农业大棚基础墙体模块预制制作工艺
ZHANG NING (author)
2023-10-17
Patent
Electronic Resource
Chinese
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
B28C
Tonaufbereitung
,
PREPARING CLAY
/
C04B
Kalk
,
LIME
Module prefabricated foundation wall of agricultural greenhouse
European Patent Office | 2023
|Prefabricating device used before pile foundation pouring
European Patent Office | 2021
|Prefabricating and splicing process for concrete mould card wall
European Patent Office | 2024
|Module prefabricating and embedding building construction method
European Patent Office | 2024
|