A platform for research: civil engineering, architecture and urbanism
Prefabricating and splicing process for concrete mould card wall
The invention relates to the field of buildings. The concrete formwork wall prefabricating and splicing process comprises the following steps that firstly, an inner wall is constructed, specifically, a grouting hole channel is formed in the wall body of the inner wall, and a connecting hole is formed in the outer side wall of the wall body of the inner wall; secondly, an outer page wall is constructed, and connecting pieces are arranged on the outer page wall; thirdly, the inner page wall and the outer page wall are spliced, the outer page wall is erected on the outer side of the inner page wall, and a connecting piece of the outer page wall is inserted into a connecting hole of the inner page wall; and fourthly, thermal insulation materials and concrete mortar are filled, specifically, the concrete mortar is poured into the grouting hole channels, and the space between the inner wall and the outer wall is filled with the thermal insulation materials. And the distance between the inner wall and the outer wall is adjustable, so that wall bodies with different thermal insulation layer thicknesses can be prepared according to the energy-saving design requirement of a building.
本发明涉及建筑领域。混凝土模卡墙体预制拼接工艺,包括如下步骤:步骤一、构建内页墙:内页墙的墙体内设有灌浆孔道,所述内页墙的墙体的外侧壁上开有连接孔;步骤二、构建外页墙:所述外页墙上设有连接件;步骤三、拼接内页墙和外页墙:将外页墙立于内页墙的外侧,所述外页墙的连接件插入到所述内页墙的连接孔内;步骤四、填充保温材料和混凝土砂浆:向灌浆孔道内灌注混凝土砂浆,向内页墙和外页墙之间填充保温材料。内页墙和外页墙之间的距离可调,从而可以根据建筑的节能设计要求,制备出不同保温层厚度的墙体。
Prefabricating and splicing process for concrete mould card wall
The invention relates to the field of buildings. The concrete formwork wall prefabricating and splicing process comprises the following steps that firstly, an inner wall is constructed, specifically, a grouting hole channel is formed in the wall body of the inner wall, and a connecting hole is formed in the outer side wall of the wall body of the inner wall; secondly, an outer page wall is constructed, and connecting pieces are arranged on the outer page wall; thirdly, the inner page wall and the outer page wall are spliced, the outer page wall is erected on the outer side of the inner page wall, and a connecting piece of the outer page wall is inserted into a connecting hole of the inner page wall; and fourthly, thermal insulation materials and concrete mortar are filled, specifically, the concrete mortar is poured into the grouting hole channels, and the space between the inner wall and the outer wall is filled with the thermal insulation materials. And the distance between the inner wall and the outer wall is adjustable, so that wall bodies with different thermal insulation layer thicknesses can be prepared according to the energy-saving design requirement of a building.
本发明涉及建筑领域。混凝土模卡墙体预制拼接工艺,包括如下步骤:步骤一、构建内页墙:内页墙的墙体内设有灌浆孔道,所述内页墙的墙体的外侧壁上开有连接孔;步骤二、构建外页墙:所述外页墙上设有连接件;步骤三、拼接内页墙和外页墙:将外页墙立于内页墙的外侧,所述外页墙的连接件插入到所述内页墙的连接孔内;步骤四、填充保温材料和混凝土砂浆:向灌浆孔道内灌注混凝土砂浆,向内页墙和外页墙之间填充保温材料。内页墙和外页墙之间的距离可调,从而可以根据建筑的节能设计要求,制备出不同保温层厚度的墙体。
Prefabricating and splicing process for concrete mould card wall
混凝土模卡墙体预制拼接工艺
CHEN FENGHUA (author)
2024-02-02
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Municipal sewage well wall prefabricating and assembling process and concrete well wall component
European Patent Office | 2021
|European Patent Office | 2024
|Prefabricating and manufacturing process for agricultural greenhouse foundation wall module
European Patent Office | 2023
|