A platform for research: civil engineering, architecture and urbanism
Assembled beam type stair
The embodiment of the invention relates to an assembled beam type stair which comprises folded plates, the folded plates comprise a top folded plate, a middle folded plate and a bottom folded plate, a first connecting hole is reserved in the top folded plate, a first connecting piece is pre-embedded in the back face of the top folded plate, a first connecting piece is reserved in the back face of the middle folded plate, and a first connecting hole is reserved in the bottom folded plate; a plurality of second connecting holes are formed in the ladder beams, reinforcement cages are arranged in the ladder beams, the first connecting holes of the top folded plates are connected with the second connecting holes of the ladder beams through second connecting pieces, and the first connecting pieces of the middle folded plates are connected with the second connecting holes of the ladder beams; and the first connecting holes of the bottom folded plates are connected with the second connecting holes of the ladder beams through second connecting pieces. The structure stress form is simple, connecting pieces are hidden through assembly of the folded plates and the ladder beams, the appearance is good, the formwork turnover rate is high, the construction period can be shortened by 25%-30%, construction energy consumption is reduced by about 40%, and material consumption is reduced by 50%-60%.
本发明实施例是关于一种拼装梁式楼梯,该拼装梁式楼梯包括:折板,所述折板包括顶部折板、中间折板和底部折板,顶部折板预留有第一连接孔,顶部折板背面预埋有第一连接件,中间折板背面预留有第一连接件,底部折板预留有第一连接孔,梯梁,所述梯梁上设置多个第二连接孔,梯梁内部设置钢筋笼,顶部折板的第一连接孔与梯梁的第二连接孔之间通过第二连接件进行连接,中间折板的第一连接件与梯梁的第二连接孔连接,底部折板的第一连接孔与梯梁的第二连接孔之间通过第二连接件连接。本发明结构受力形式简单,折板与梯梁的拼装隐藏了连接件,外观良好,模板周转率较高,可缩短施工周期25%‑30%,降低施工能耗约40%,减少材料消耗50%~60%。
Assembled beam type stair
The embodiment of the invention relates to an assembled beam type stair which comprises folded plates, the folded plates comprise a top folded plate, a middle folded plate and a bottom folded plate, a first connecting hole is reserved in the top folded plate, a first connecting piece is pre-embedded in the back face of the top folded plate, a first connecting piece is reserved in the back face of the middle folded plate, and a first connecting hole is reserved in the bottom folded plate; a plurality of second connecting holes are formed in the ladder beams, reinforcement cages are arranged in the ladder beams, the first connecting holes of the top folded plates are connected with the second connecting holes of the ladder beams through second connecting pieces, and the first connecting pieces of the middle folded plates are connected with the second connecting holes of the ladder beams; and the first connecting holes of the bottom folded plates are connected with the second connecting holes of the ladder beams through second connecting pieces. The structure stress form is simple, connecting pieces are hidden through assembly of the folded plates and the ladder beams, the appearance is good, the formwork turnover rate is high, the construction period can be shortened by 25%-30%, construction energy consumption is reduced by about 40%, and material consumption is reduced by 50%-60%.
本发明实施例是关于一种拼装梁式楼梯,该拼装梁式楼梯包括:折板,所述折板包括顶部折板、中间折板和底部折板,顶部折板预留有第一连接孔,顶部折板背面预埋有第一连接件,中间折板背面预留有第一连接件,底部折板预留有第一连接孔,梯梁,所述梯梁上设置多个第二连接孔,梯梁内部设置钢筋笼,顶部折板的第一连接孔与梯梁的第二连接孔之间通过第二连接件进行连接,中间折板的第一连接件与梯梁的第二连接孔连接,底部折板的第一连接孔与梯梁的第二连接孔之间通过第二连接件连接。本发明结构受力形式简单,折板与梯梁的拼装隐藏了连接件,外观良好,模板周转率较高,可缩短施工周期25%‑30%,降低施工能耗约40%,减少材料消耗50%~60%。
Assembled beam type stair
一种拼装梁式楼梯
HAN WENCHAO (author) / GUO YUYUAN (author) / ZHU WENKAI (author) / BU XINXING (author) / ZHANG SIHAI (author) / DENG MINGKE (author)
2023-10-20
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden