A platform for research: civil engineering, architecture and urbanism
Prefabricated installation component for pre-buried water and electricity pipeline construction and installation method of prefabricated installation component
The invention discloses a prefabricated installation component for pre-buried water and electricity pipeline construction and an installation method of the prefabricated installation component in the technical field of decoration engineering, the prefabricated installation component comprises two connectors, a pipeline, a first telescopic rod and a cutting mechanism, installation frames are arranged at the two ends of the first telescopic rod correspondingly, and fixing mechanisms are arranged in the installation frames correspondingly; the fixing mechanism on the right side is provided with a cutting mechanism, the two fixing mechanisms are used for jointly fixing a pipeline and fixedly connecting connectors correspondingly, and the cutting mechanism is used for cutting off the pipeline; errors occurring in the two measurement and comparison processes are avoided, the construction difficulty is further reduced, the construction efficiency is improved, and unnecessary loss of the pipeline is effectively reduced.
本发明公开了装修工程技术领域的一种预埋水电管道施工用预制安装构件及其安装方法,包括两个连接头、管道、第一伸缩杆和切割机构,所述第一伸缩杆两端均设置有安装架,所述安装架内均设置有固定机构,右侧的所述固定机构设置有切割机构,两个所述固定机构用于共同固定管道以及分别固定连接连接头,所述切割机构用于截断管道;免除了两次测量比对过程中出现的误差,进一步的降低了施工难度,提高了施工效率,有效的降低了管道的不必要损耗。
Prefabricated installation component for pre-buried water and electricity pipeline construction and installation method of prefabricated installation component
The invention discloses a prefabricated installation component for pre-buried water and electricity pipeline construction and an installation method of the prefabricated installation component in the technical field of decoration engineering, the prefabricated installation component comprises two connectors, a pipeline, a first telescopic rod and a cutting mechanism, installation frames are arranged at the two ends of the first telescopic rod correspondingly, and fixing mechanisms are arranged in the installation frames correspondingly; the fixing mechanism on the right side is provided with a cutting mechanism, the two fixing mechanisms are used for jointly fixing a pipeline and fixedly connecting connectors correspondingly, and the cutting mechanism is used for cutting off the pipeline; errors occurring in the two measurement and comparison processes are avoided, the construction difficulty is further reduced, the construction efficiency is improved, and unnecessary loss of the pipeline is effectively reduced.
本发明公开了装修工程技术领域的一种预埋水电管道施工用预制安装构件及其安装方法,包括两个连接头、管道、第一伸缩杆和切割机构,所述第一伸缩杆两端均设置有安装架,所述安装架内均设置有固定机构,右侧的所述固定机构设置有切割机构,两个所述固定机构用于共同固定管道以及分别固定连接连接头,所述切割机构用于截断管道;免除了两次测量比对过程中出现的误差,进一步的降低了施工难度,提高了施工效率,有效的降低了管道的不必要损耗。
Prefabricated installation component for pre-buried water and electricity pipeline construction and installation method of prefabricated installation component
一种预埋水电管道施工用预制安装构件及其安装方法
LI DAN (author) / YE SHAODIAN (author) / PENG HAIHUI (author)
2023-10-20
Patent
Electronic Resource
Chinese
Prefabricated berthing component installation supporting structure and installation method
European Patent Office | 2022
|Auxiliary installation component of prefabricated wall panel
European Patent Office | 2024
|Installation technology of novel prefabricated assembly type component
European Patent Office | 2022
|