A platform for research: civil engineering, architecture and urbanism
Electric pole stay wire installation auxiliary device
The invention relates to the technical field of traction equipment, in particular to an electric pole stay wire installation auxiliary device, which comprises a hanging mechanism, which comprises a first hook, and a first anti-falling assembly and a second anti-falling assembly which are installed on the first hook; the traction mechanism comprises a stay wire and a second hook connected with the stay wire, the stay wire is connected with the first hook through pulleys, the first hook is composed of two S-shaped single bodies, the first hook is internally connected through a fixing block, a dovetail groove is formed in the side wall of the fixing block, two pairs of pulleys are connected in the first hook, and the two pairs of pulleys are connected with the two S-shaped single bodies. The pull wire penetrates through the pulley, the first anti-disengaging assembly comprises a baffle, one end of the baffle is hinged to the first hook, the other end of the baffle is in lap joint with the inner side of the hook tip, a torsional spring is arranged between the baffle and the first hook, the second anti-disengaging assembly comprises an impeller, and short pipes are arranged at the two ends of the impeller in the axial direction of the impeller.
本发明涉及牵引设备技术领域,尤其是一种电杆拉线安装辅助装置,包括挂接机构,其包括第一挂钩,以及安装于所述第一挂钩上的第一防脱组件和第二防脱组件;牵引机构,其包括拉线,以及与所述拉线连接的第二挂钩,且所述拉线与第一挂钩通过滑轮连接,所述第一挂钩由两个S型单体组成,第一挂钩内通过固定块连接,且所述固定块侧壁开设有燕尾槽,所述第一挂钩内连接有两对滑轮,且所述拉线穿过滑轮之间,所述第一防脱组件,其包括挡板,所述挡板一端与第一挂钩铰接,且所述挡板另一端与钩尖内侧搭接,所述挡板与第一挂钩之间设置有扭簧,所述第二防脱组件,其包括叶轮,所述叶轮的两端沿其轴向设置有短管。
Electric pole stay wire installation auxiliary device
The invention relates to the technical field of traction equipment, in particular to an electric pole stay wire installation auxiliary device, which comprises a hanging mechanism, which comprises a first hook, and a first anti-falling assembly and a second anti-falling assembly which are installed on the first hook; the traction mechanism comprises a stay wire and a second hook connected with the stay wire, the stay wire is connected with the first hook through pulleys, the first hook is composed of two S-shaped single bodies, the first hook is internally connected through a fixing block, a dovetail groove is formed in the side wall of the fixing block, two pairs of pulleys are connected in the first hook, and the two pairs of pulleys are connected with the two S-shaped single bodies. The pull wire penetrates through the pulley, the first anti-disengaging assembly comprises a baffle, one end of the baffle is hinged to the first hook, the other end of the baffle is in lap joint with the inner side of the hook tip, a torsional spring is arranged between the baffle and the first hook, the second anti-disengaging assembly comprises an impeller, and short pipes are arranged at the two ends of the impeller in the axial direction of the impeller.
本发明涉及牵引设备技术领域,尤其是一种电杆拉线安装辅助装置,包括挂接机构,其包括第一挂钩,以及安装于所述第一挂钩上的第一防脱组件和第二防脱组件;牵引机构,其包括拉线,以及与所述拉线连接的第二挂钩,且所述拉线与第一挂钩通过滑轮连接,所述第一挂钩由两个S型单体组成,第一挂钩内通过固定块连接,且所述固定块侧壁开设有燕尾槽,所述第一挂钩内连接有两对滑轮,且所述拉线穿过滑轮之间,所述第一防脱组件,其包括挡板,所述挡板一端与第一挂钩铰接,且所述挡板另一端与钩尖内侧搭接,所述挡板与第一挂钩之间设置有扭簧,所述第二防脱组件,其包括叶轮,所述叶轮的两端沿其轴向设置有短管。
Electric pole stay wire installation auxiliary device
一种电杆拉线安装辅助装置
DENG JUNSHAN (author) / LI WEI (author) / YANG ZHONG (author) / LI HUAPENG (author) / HUANG ZHIQING (author) / ZHENG YOUZHUO (author) / WANG FENG (author) / ZHANG TAIWEI (author) / LIU YIFEI (author) / WU DI (author)
2023-10-20
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Auxiliary device for erecting stay wire on electric pole
European Patent Office | 2023
|