A platform for research: civil engineering, architecture and urbanism
Prefabricated flat slab column structure connected through high-strength bolts and construction method of prefabricated flat slab column structure
The invention discloses a prefabricated flat slab column structure connected through high-strength bolts and a construction method of the prefabricated flat slab column structure. The prefabricated flat slab column structure comprises a fully-prefabricated floor slab and a prefabricated column supported on the lower surface of the fully-prefabricated floor slab. The prefabricated columns are reinforced concrete columns, column top brackets are arranged at the tops of the prefabricated columns, and column longitudinal bars extend out of the top faces of the prefabricated columns. The fully-prefabricated floor slab is a rectangular reinforced concrete floor slab, and the middle of the fully-prefabricated floor slab is provided with an embedded metal corrugated pipe vertically penetrating in the thickness direction. U-shaped horizontal reinforcing bars extend out of the peripheral side faces of the fully-prefabricated floor slab, and embedded steel plates are arranged on the bottom faces of the peripheral edges of the fully-prefabricated floor slab; the prefabricated columns and the fully prefabricated floor slabs are connected in an inserted and anchored mode through column longitudinal bars and embedded metal corrugated pipes. The fully-prefabricated floor slabs are connected through the connecting joints. According to the method, the procedure of mounting and dismounting formworks and supports in a large range on a flat slab project site can be omitted, efficient mounting of the prefabricated floor slabs and the prefabricated columns on the construction site is achieved, the construction period is shortened, and meanwhile the strength and quality of components can be guaranteed.
本发明公开了一种高强螺栓连接的预制无梁楼盖板柱结构及其施工方法,包括全预制楼板和支撑在全预制楼板下表面的预制柱;预制柱为钢筋混凝土柱,预制柱顶部设有柱顶牛腿,预制柱顶面外伸柱纵筋;全预制楼板为矩形钢筋混凝土楼板,全预制楼板中部设置沿厚度方向竖直贯通的预埋金属波纹管;全预制楼板四周侧面外伸U型胡子筋,全预制楼板四周边缘底面设置预埋钢板;预制柱和全预制楼板之间通过柱纵筋和预埋金属波纹管插接锚固连接;全预制楼板之间通过连接节点实现连接。本发明可省去无梁楼盖项目现场大范围安拆模板和支架的工序,实现预制楼板与预制柱在施工现场的高效安装,缩短施工工期,同时还能保证构件强度和质量。
Prefabricated flat slab column structure connected through high-strength bolts and construction method of prefabricated flat slab column structure
The invention discloses a prefabricated flat slab column structure connected through high-strength bolts and a construction method of the prefabricated flat slab column structure. The prefabricated flat slab column structure comprises a fully-prefabricated floor slab and a prefabricated column supported on the lower surface of the fully-prefabricated floor slab. The prefabricated columns are reinforced concrete columns, column top brackets are arranged at the tops of the prefabricated columns, and column longitudinal bars extend out of the top faces of the prefabricated columns. The fully-prefabricated floor slab is a rectangular reinforced concrete floor slab, and the middle of the fully-prefabricated floor slab is provided with an embedded metal corrugated pipe vertically penetrating in the thickness direction. U-shaped horizontal reinforcing bars extend out of the peripheral side faces of the fully-prefabricated floor slab, and embedded steel plates are arranged on the bottom faces of the peripheral edges of the fully-prefabricated floor slab; the prefabricated columns and the fully prefabricated floor slabs are connected in an inserted and anchored mode through column longitudinal bars and embedded metal corrugated pipes. The fully-prefabricated floor slabs are connected through the connecting joints. According to the method, the procedure of mounting and dismounting formworks and supports in a large range on a flat slab project site can be omitted, efficient mounting of the prefabricated floor slabs and the prefabricated columns on the construction site is achieved, the construction period is shortened, and meanwhile the strength and quality of components can be guaranteed.
本发明公开了一种高强螺栓连接的预制无梁楼盖板柱结构及其施工方法,包括全预制楼板和支撑在全预制楼板下表面的预制柱;预制柱为钢筋混凝土柱,预制柱顶部设有柱顶牛腿,预制柱顶面外伸柱纵筋;全预制楼板为矩形钢筋混凝土楼板,全预制楼板中部设置沿厚度方向竖直贯通的预埋金属波纹管;全预制楼板四周侧面外伸U型胡子筋,全预制楼板四周边缘底面设置预埋钢板;预制柱和全预制楼板之间通过柱纵筋和预埋金属波纹管插接锚固连接;全预制楼板之间通过连接节点实现连接。本发明可省去无梁楼盖项目现场大范围安拆模板和支架的工序,实现预制楼板与预制柱在施工现场的高效安装,缩短施工工期,同时还能保证构件强度和质量。
Prefabricated flat slab column structure connected through high-strength bolts and construction method of prefabricated flat slab column structure
一种高强螺栓连接的预制无梁楼盖板柱结构及其施工方法
LYU XUEYUAN (author) / LI HAO (author) / ZHAN BIXIONG (author) / LI BEI (author) / YAO BOQIANG (author) / LI YONGGAN (author)
2023-10-24
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2022
|Prefabricated slab track structure and prefabricated slab track structure mounting method
European Patent Office | 2024
|European Patent Office | 2023
|