A platform for research: civil engineering, architecture and urbanism
Static pressure method pile pitching construction process
The invention relates to the technical field of pile sinking construction, in particular to a static pressure method pile inserting construction technology which comprises the steps that before pile inserting and pressing, a vertical monitoring system is arranged at a preset distance away from a pipe pile, and the perpendicularity of the pipe pile in the pile inserting and pressing process is monitored; in the pile inserting and pressing process, whether the vertical condition meets the preset vertical requirement or not is judged, and if yes, pile inserting and pile pressing are continued; if not, generating vertical correction data according to the vertical condition and a preset vertical requirement; and according to the vertical correction data, the pipe pile is corrected in the pile inserting and pressing process. The scheme can adapt to different building construction environments, is not influenced by ground flatness, carries out vertical monitoring, and can reduce labor cost and eliminate potential safety hazards.
本发明涉及沉桩施工技术领域,具体为一种静压法插桩施工工艺,包括:在插桩压桩前,距离管桩预设距离,设置垂直监测系统,监测插桩压桩过程中管桩的垂直;在插桩压桩过程中,判断垂直情况是否满足预设垂直要求,若是,则继续插桩压桩;若否,则根据垂直情况和预设垂直要求,生成垂直修正数据;根据垂直修正数据,在插桩压桩过程中对管桩进行修正。本方案能适应不同建筑施工环境,不受地面平整度影响,进行垂直监测,且能降低人工成本,消除安全隐患。
Static pressure method pile pitching construction process
The invention relates to the technical field of pile sinking construction, in particular to a static pressure method pile inserting construction technology which comprises the steps that before pile inserting and pressing, a vertical monitoring system is arranged at a preset distance away from a pipe pile, and the perpendicularity of the pipe pile in the pile inserting and pressing process is monitored; in the pile inserting and pressing process, whether the vertical condition meets the preset vertical requirement or not is judged, and if yes, pile inserting and pile pressing are continued; if not, generating vertical correction data according to the vertical condition and a preset vertical requirement; and according to the vertical correction data, the pipe pile is corrected in the pile inserting and pressing process. The scheme can adapt to different building construction environments, is not influenced by ground flatness, carries out vertical monitoring, and can reduce labor cost and eliminate potential safety hazards.
本发明涉及沉桩施工技术领域,具体为一种静压法插桩施工工艺,包括:在插桩压桩前,距离管桩预设距离,设置垂直监测系统,监测插桩压桩过程中管桩的垂直;在插桩压桩过程中,判断垂直情况是否满足预设垂直要求,若是,则继续插桩压桩;若否,则根据垂直情况和预设垂直要求,生成垂直修正数据;根据垂直修正数据,在插桩压桩过程中对管桩进行修正。本方案能适应不同建筑施工环境,不受地面平整度影响,进行垂直监测,且能降低人工成本,消除安全隐患。
Static pressure method pile pitching construction process
静压法插桩施工工艺
DONG FENGBO (author) / CAI DONGBO (author) / CHAI SHAOQIANG (author) / JIN CHUAN (author) / TANG WEI (author) / YAN DONGJIE (author)
2023-10-27
Patent
Electronic Resource
Chinese
Offshore pile pitching construction device and construction process
European Patent Office | 2023
|Pulse hydraulic static pressure pile machine construction process method
European Patent Office | 2022
|Static pressure composite pile construction equipment and process
European Patent Office | 2024
|