A platform for research: civil engineering, architecture and urbanism
High-wave continuous welding stainless steel roof construction process
The invention discloses a high-wave continuous welding stainless steel roof construction technology, and relates to the technical field of building roofs. In order to solve the problems of high construction difficulty and low efficiency, the high-wave continuous welding stainless steel roof specifically comprises a bottom plate, a main purline, a secondary purline, a non-woven fabric, a steel plate, a PE vapor barrier film, a purline support, heat preservation rock wool, a waterproof roll, an n-shaped purline, glass cotton, a stainless steel continuous welding roof panel and an anti-corrosion paint layer from bottom to top. The high-wave continuous welding stainless steel roof construction technology comprises the following steps that firstly, the bottom plates are assembled, and the main purlins and the secondary purlins are installed and fixed to a steel structure during assembling. According to the invention, the hoisting connection of the bottom plate is carried out in different areas, the steel springboards and the lifting cages are respectively adopted for the areas with different heights to assist the construction, and the safety net rack and the safety rope are additionally arranged, so that on one hand, the construction difficulty can be greatly reduced, the construction efficiency is improved, and on the other hand, the construction safety is also ensured.
本发明公开了一种高波连续焊不锈钢屋面施工工艺,涉及建筑屋面技术领域。为了解决施工难度大,效率低问题,具体包括该高波连续焊不锈钢屋面包括由下而上的底板、主檩条、次檩条、无纺布、钢板、PE隔汽膜、檩托、保温岩棉、防水卷材、几字檩条、玻璃丝棉、不锈钢连续焊接屋面板以及防腐漆层,所述高波连续焊不锈钢屋面施工工艺包括以下步骤:首先将底板进行组装,在组装的同时将主檩条与次檩条安装固定于钢结构上。本发明对于底板吊装连接,采用分区域进行,并且对不同高度的区域分别采用钢跳板和吊笼辅助施工,并且加设安全网架和安全绳,一方面可极大的降低施工难度,提高施工效率,另一方面也保证了施工的安全性。
High-wave continuous welding stainless steel roof construction process
The invention discloses a high-wave continuous welding stainless steel roof construction technology, and relates to the technical field of building roofs. In order to solve the problems of high construction difficulty and low efficiency, the high-wave continuous welding stainless steel roof specifically comprises a bottom plate, a main purline, a secondary purline, a non-woven fabric, a steel plate, a PE vapor barrier film, a purline support, heat preservation rock wool, a waterproof roll, an n-shaped purline, glass cotton, a stainless steel continuous welding roof panel and an anti-corrosion paint layer from bottom to top. The high-wave continuous welding stainless steel roof construction technology comprises the following steps that firstly, the bottom plates are assembled, and the main purlins and the secondary purlins are installed and fixed to a steel structure during assembling. According to the invention, the hoisting connection of the bottom plate is carried out in different areas, the steel springboards and the lifting cages are respectively adopted for the areas with different heights to assist the construction, and the safety net rack and the safety rope are additionally arranged, so that on one hand, the construction difficulty can be greatly reduced, the construction efficiency is improved, and on the other hand, the construction safety is also ensured.
本发明公开了一种高波连续焊不锈钢屋面施工工艺,涉及建筑屋面技术领域。为了解决施工难度大,效率低问题,具体包括该高波连续焊不锈钢屋面包括由下而上的底板、主檩条、次檩条、无纺布、钢板、PE隔汽膜、檩托、保温岩棉、防水卷材、几字檩条、玻璃丝棉、不锈钢连续焊接屋面板以及防腐漆层,所述高波连续焊不锈钢屋面施工工艺包括以下步骤:首先将底板进行组装,在组装的同时将主檩条与次檩条安装固定于钢结构上。本发明对于底板吊装连接,采用分区域进行,并且对不同高度的区域分别采用钢跳板和吊笼辅助施工,并且加设安全网架和安全绳,一方面可极大的降低施工难度,提高施工效率,另一方面也保证了施工的安全性。
High-wave continuous welding stainless steel roof construction process
一种高波连续焊不锈钢屋面施工工艺
ZHENG CHENGLI (author) / BIAN KELEI (author) / DAI HUIFU (author) / WANG YANG (author) / JIANG BING (author) / LI JIE (author) / GAO WENGUANG (author) / HAN JIANCHENG (author) / ZHANG LANFANG (author) / YANG XINLU (author)
2023-11-03
Patent
Electronic Resource
Chinese
Tennis court stainless steel continuous welding metal roof construction method
European Patent Office | 2022
|Continuous welding stainless steel integral roof system and construction method
European Patent Office | 2023
|High-wave color coating welding stainless steel roof system and construction method thereof
European Patent Office | 2023
|Continuous welding color-coated stainless steel roof panel structure and process
European Patent Office | 2024
|Stainless steel continuous welding roof and mounting method thereof
European Patent Office | 2021
|