Continuous welding stainless steel integral roof system and construction method
The invention discloses a continuous welding stainless steel integral roof system and a construction method. The roof system comprises a main purlin system, a steel pipe support installed on the main purlin system, a secondary purlin system installed on the steel pipe support, a profiled steel sheet laid on the secondary purlin system, a steel flat plate laid on the profiled steel sheet, a waterproof roll arranged on the steel flat plate and a sound insulation layer arranged on the waterproof roll. The metal roof board is arranged on the sound insulation layer; the anti-corrosion layer is sprayed on the metal roof board; the waterproof coiled material is provided with a fixing base used for fixing the metal roof board. According to the roof panel fixing base, the roof panel fixing base is arranged to be in the form of combining the fixing pieces and the tying pieces, panel deformation caused by large displacement of the panel or thermal expansion and cold contraction can be effectively resisted, the wind uplift resistance is high, and stability and firmness are good.
本发明公开了一种连续焊不锈钢整体屋面系统及施工方法,屋面系统包括主檩系统、安装在主檩系统上的钢管支托、安装在钢管支托上的次檩系统、铺设在次檩系统上的压型钢板、铺设在压型钢板上的钢平板、设置在钢平板上的防水卷材、设置在防水卷材上的隔音层、设置在隔音层上的金属屋面板以及喷涂在金属屋面板上的防腐层;所述防水卷材上设有用于固定金属屋面板的固定座。本申请通过将屋面板固定底座设置为固定件和拉结件组合的形式,能够有效抵抗面板较大位移或者热胀冷缩带来的面板变形,抗风揭能力强,稳定性和牢固性好。
Continuous welding stainless steel integral roof system and construction method
The invention discloses a continuous welding stainless steel integral roof system and a construction method. The roof system comprises a main purlin system, a steel pipe support installed on the main purlin system, a secondary purlin system installed on the steel pipe support, a profiled steel sheet laid on the secondary purlin system, a steel flat plate laid on the profiled steel sheet, a waterproof roll arranged on the steel flat plate and a sound insulation layer arranged on the waterproof roll. The metal roof board is arranged on the sound insulation layer; the anti-corrosion layer is sprayed on the metal roof board; the waterproof coiled material is provided with a fixing base used for fixing the metal roof board. According to the roof panel fixing base, the roof panel fixing base is arranged to be in the form of combining the fixing pieces and the tying pieces, panel deformation caused by large displacement of the panel or thermal expansion and cold contraction can be effectively resisted, the wind uplift resistance is high, and stability and firmness are good.
本发明公开了一种连续焊不锈钢整体屋面系统及施工方法,屋面系统包括主檩系统、安装在主檩系统上的钢管支托、安装在钢管支托上的次檩系统、铺设在次檩系统上的压型钢板、铺设在压型钢板上的钢平板、设置在钢平板上的防水卷材、设置在防水卷材上的隔音层、设置在隔音层上的金属屋面板以及喷涂在金属屋面板上的防腐层;所述防水卷材上设有用于固定金属屋面板的固定座。本申请通过将屋面板固定底座设置为固定件和拉结件组合的形式,能够有效抵抗面板较大位移或者热胀冷缩带来的面板变形,抗风揭能力强,稳定性和牢固性好。
Continuous welding stainless steel integral roof system and construction method
一种连续焊不锈钢整体屋面系统及施工方法
LI BIN (author) / ZHANG WEI (author) / GAO WENGUANG (author) / ZHANG LANFANG (author) / WANG YANG (author) / DAI HUIFU (author) / JI YUAN (author) / CAO MING (author) / XU YARU (author) / LIN XINGJIE (author)
2023-04-25
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
High-wave continuous welding stainless steel roof construction process
European Patent Office | 2023
|Tennis court stainless steel continuous welding metal roof construction method
European Patent Office | 2022
|Composite integral stainless steel welded roof and construction method
European Patent Office | 2024
|Stainless steel continuous welding roof and mounting method thereof
European Patent Office | 2021
|High-wave color coating welding stainless steel roof system and construction method thereof
European Patent Office | 2023
|