A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of constructional engineering, and discloses a fabricated building wall and a mounting method.The fabricated building wall comprises a bottom mounting block and a shear wall, a communicating mechanism is arranged on the inner wall of the shear wall and comprises a grouting opening, a mounting sleeve and a connecting channel, and a one-way oscillation mechanism is arranged on the inner wall of the connecting channel; the one-way oscillation mechanism comprises a fixing sleeve. According to the fabricated building wall and the mounting method, the one-way oscillation mechanism is arranged, cement pushes away the blocking disc firstly, the blocking disc enters the inner wall of the circular truncated cone groove leftwards, at the moment, the blocking disc loses constraint of the fixing sleeve, and the blocking disc oscillates under the impact force of the cement and impacts on the inner wall of the circular truncated cone groove; cement on the inner wall of the mounting sleeve is compacted by the force of the first spring, and the cement on the inner wall of the mounting sleeve is further compacted by the vibration force, so that the situation that the cement on the inner wall of the mounting sleeve is not compacted with a top reinforcing steel bar of the bottom mounting block is avoided.
本发明涉及建筑工程技术领域,且公开了一种装配式建筑墙体及安装方法,包括底部安装块和剪力墙,所述剪力墙的内壁上设置有连通机构,所述连通机构包括:灌浆口、安装套、连接通道,所述连接通道的内壁上设置有单向震荡机构,所述单向震荡机构包括:固定套。该装配式建筑墙体及安装方法,通过设置了单向震荡机构,水泥先将堵塞盘推开,使得堵塞盘向左进入圆台凹槽的内壁,此时堵塞盘失去固定套的约束,堵塞盘在水泥的冲击力作用下震荡,在圆台凹槽的内壁上冲击,弹簧一的力使得安装套的内壁的水泥被压实,震荡的力进一步将安装套的内壁的水泥被压实,起到了避免安装套的内壁水泥没有与底部安装块的顶部钢筋压实。
The invention relates to the technical field of constructional engineering, and discloses a fabricated building wall and a mounting method.The fabricated building wall comprises a bottom mounting block and a shear wall, a communicating mechanism is arranged on the inner wall of the shear wall and comprises a grouting opening, a mounting sleeve and a connecting channel, and a one-way oscillation mechanism is arranged on the inner wall of the connecting channel; the one-way oscillation mechanism comprises a fixing sleeve. According to the fabricated building wall and the mounting method, the one-way oscillation mechanism is arranged, cement pushes away the blocking disc firstly, the blocking disc enters the inner wall of the circular truncated cone groove leftwards, at the moment, the blocking disc loses constraint of the fixing sleeve, and the blocking disc oscillates under the impact force of the cement and impacts on the inner wall of the circular truncated cone groove; cement on the inner wall of the mounting sleeve is compacted by the force of the first spring, and the cement on the inner wall of the mounting sleeve is further compacted by the vibration force, so that the situation that the cement on the inner wall of the mounting sleeve is not compacted with a top reinforcing steel bar of the bottom mounting block is avoided.
本发明涉及建筑工程技术领域,且公开了一种装配式建筑墙体及安装方法,包括底部安装块和剪力墙,所述剪力墙的内壁上设置有连通机构,所述连通机构包括:灌浆口、安装套、连接通道,所述连接通道的内壁上设置有单向震荡机构,所述单向震荡机构包括:固定套。该装配式建筑墙体及安装方法,通过设置了单向震荡机构,水泥先将堵塞盘推开,使得堵塞盘向左进入圆台凹槽的内壁,此时堵塞盘失去固定套的约束,堵塞盘在水泥的冲击力作用下震荡,在圆台凹槽的内壁上冲击,弹簧一的力使得安装套的内壁的水泥被压实,震荡的力进一步将安装套的内壁的水泥被压实,起到了避免安装套的内壁水泥没有与底部安装块的顶部钢筋压实。
Fabricated building wall and mounting method
一种装配式建筑墙体及安装方法
LI DEFU (author)
2023-11-10
Patent
Electronic Resource
Chinese
Fabricated building outer wall mounting equipment and mounting method
European Patent Office | 2023
|