A platform for research: civil engineering, architecture and urbanism
Truss formwork installed on ship lock abutment pier and installation method
The invention relates to a truss formwork installed on a ship lock abutment pier and an installation method, and belongs to the technical field of water transportation construction.The truss formwork comprises a truss and two triangular supporting frames, the triangular supporting frames are both installed on the side wall of the poured concrete abutment pier, and bearing seats are arranged on the triangular supporting frames; the truss is located above the triangular supporting frame and abuts against the bearing base, the lower end of the truss is fixedly connected with the side wall of the poured concrete abutment pier, a connecting base is arranged at the upper end of the truss, a diagonal draw bar is arranged on the connecting base, and one end of the diagonal draw bar is connected to the connecting base. The other ends of the diagonal draw bars are fixedly connected to the positions, away from the truss, of the upper surfaces of the poured concrete abutment piers, and first walkway plates are laid on the two triangular supporting frames. The method has the effect of improving the construction safety of workers.
本申请涉及一种安装在船闸边墩的桁架模板及安装方法,属于水运施工的技术领域,桁架模板包括桁架以及两个三角支撑架,三角支撑架均安装在已浇筑混凝土边墩的侧壁上,三角支撑架上设置有承托座,桁架位于三角支撑架上方并与承托座抵接,桁架的下端与已浇筑混凝土边墩的侧壁固定连接,桁架的上端设置有连接座,连接座上设置有斜拉杆,斜拉杆一端连接在连接座上,斜拉杆的另一端固定连接在已浇筑混凝土边墩上表面远离桁架的位置处,两个三角支撑架上铺设有第一走道板。本申请具有提高工作人员施工安全性的效果。
Truss formwork installed on ship lock abutment pier and installation method
The invention relates to a truss formwork installed on a ship lock abutment pier and an installation method, and belongs to the technical field of water transportation construction.The truss formwork comprises a truss and two triangular supporting frames, the triangular supporting frames are both installed on the side wall of the poured concrete abutment pier, and bearing seats are arranged on the triangular supporting frames; the truss is located above the triangular supporting frame and abuts against the bearing base, the lower end of the truss is fixedly connected with the side wall of the poured concrete abutment pier, a connecting base is arranged at the upper end of the truss, a diagonal draw bar is arranged on the connecting base, and one end of the diagonal draw bar is connected to the connecting base. The other ends of the diagonal draw bars are fixedly connected to the positions, away from the truss, of the upper surfaces of the poured concrete abutment piers, and first walkway plates are laid on the two triangular supporting frames. The method has the effect of improving the construction safety of workers.
本申请涉及一种安装在船闸边墩的桁架模板及安装方法,属于水运施工的技术领域,桁架模板包括桁架以及两个三角支撑架,三角支撑架均安装在已浇筑混凝土边墩的侧壁上,三角支撑架上设置有承托座,桁架位于三角支撑架上方并与承托座抵接,桁架的下端与已浇筑混凝土边墩的侧壁固定连接,桁架的上端设置有连接座,连接座上设置有斜拉杆,斜拉杆一端连接在连接座上,斜拉杆的另一端固定连接在已浇筑混凝土边墩上表面远离桁架的位置处,两个三角支撑架上铺设有第一走道板。本申请具有提高工作人员施工安全性的效果。
Truss formwork installed on ship lock abutment pier and installation method
一种安装在船闸边墩的桁架模板及安装方法
XIONG ZHAN (author) / LONG QIULIANG (author) / YUAN QUAN (author) / LONG MINGHAO (author) / YU RAN (author) / CHEN XU (author) / XIA XUEWEN (author) / WAN JIAQI (author) / FANG MINGKE (author) / HUANG SHANG (author)
2023-11-14
Patent
Electronic Resource
Chinese
Bridge abutment high pier hydraulic creeping formwork construction method
European Patent Office | 2023
|European Patent Office | 2022
|British Library Conference Proceedings | 1992
|